Topcoder Member Records ✱ disclaimer

Do you find there is no good way at the official ‌Topcoder website to see and show others your member records? Are you interested to know, how much your fellow Topcoder members earn? This tool provides visualization of Topcoder community member records, and estimates their earnings.

Look-up

Updated on Nov 28, 2023
NOTE: Updates of member records have been disabled on Dec 14, 2023 as changes in the underlying Topcoder APIs rendered the current implementation non-functional. Currently there is no certain plan to fix it.
Avatar

Wendell

Rating: 2200

Estimation of Competitor Earnings

Total days spent competing: ‌222 days

Total earnings from competing: 19,700 US dollars

Estimated effective hourly rate: ‌11.1 USD / hour

Estimation of Copilot Earnings

Total days spent copiloting: ‌7 years 103 days

Total earnings from copiloting: 738,000 US dollars

Estimated effective hourly rate: ‌34.7 USD / hour

Records Legend:

/ / ‌ – Topcoder Open Champion in a Data Science / Development / Design track.
1st – challenge winner
2nd – challenge runner-up
– another prize placement
– copilot (technical project manager)

Re-inventing Consortium by Web3 DAO Technologies

Dates: Aug 22 – Sep 11, 2023
Prize: $600

Reporting Application - API Development #1

Technologies: Java, MySQL, REST, Spring Boot
Dates: Jan 12 – 19, 2023
Prize: $600

Reporting Application - UI Prototype #1

Technologies: ReactJS, TypeScript, UI Prototype
Dates: Dec 12 – 17, 2022
Prize: $600

Area Compass - API Development Challenge #1

Technologies: JavaScript, MySQL, Oauth, REST
Dates: Jul 28 – Aug 3, 2022
Prize: $600

Document Analysis And Summary API

Technologies: MySQL, Python, REST
Dates: Oct 19 – 25, 2021
Prize: $600

[72h] Odyssey AEKM Service - Add Flyway Schema Management

Technologies: Google Cloud, Java, MySQL, REST
Dates: Sep 12 – 15, 2021
Prize: $600

DMT - Golang REST API Fun Challenge

Technologies: Golang, MySQL, REST
Dates: Aug 19 – 31, 2021
Prize: $600

Ognomy Phase 4.1 Patient Web Portal UI Prototype 1

Technologies: CSS, HTML5, JavaScript, ReactJS
Dates: Aug 25 – 31, 2021
Prize: $600

DMT - Java SpringBoot API Fun Challenge

Technologies: API, Java, Microservices, MongoDB, REST
Dates: Jun 23 – Jul 3, 2021
Prize: $600

Data Management REST API Development

Technologies: MySQL, REST, TypeScript
Dates: Jun 21 – 25, 2021
Prize: $600

HP DMT Special Deals Platform - UI Prototype #1

Technologies: AWS, CSS, Frontend, HTML5, ReactJS, TypeScript
Dates: May 20 – 25, 2021
Prize: $600

Line Message Manager REST API

Technologies: MySQL, Oauth, Python, REST
Dates: May 10 – 16, 2021
Prize: $600

Odyssey - Drupal 9 JSON Editor

Technologies: Docker, Drupal, Google Cloud, JSON, Kubernetes, REST
Dates: May 4 – 11, 2021
Prize: $600

Line Message Manager UI Prototype

Technologies: CSS, Frontend, HTML5, ReactJS, TypeScript
Dates: May 4 – 10, 2021
Prize: $600

Ognomy Web App and Backend Performance Analysis

Technologies: AWS, MongoDB, ReactJS
Dates: Apr 23 – 28, 2021
Prize: $600

Odyssey OLB - Contact RM UI Prototype Part 2

Technologies: Frontend, Google, ReactJS, TypeScript, UI Prototype
Dates: Mar 5 – 11, 2021
Prize: $600

Odyssey OLB - Contact RM UI Prototype Part 1

Technologies: Frontend, Google, ReactJS, TypeScript
Dates: Feb 24 – Mar 1, 2021
Prize: $600

Odyssey MB - Contact RM UI Prototype - Book Appointment

Technologies: Android, Frontend, Google, Mobile, React Native, TypeScript, iOS
Dates: Feb 23 – 28, 2021
Prize: $600

72h Odyssey Microservices - Secure Message and Document Repo API Design

Technologies: Java, Microservices, MySQL, REST
Dates: Nov 28 – Dec 1, 2020
Prize: $600

Odyssey OLB ReactJS Responsive Prototype 9 - Help and Marketing

Technologies: Frontend, ReactJS
Dates: Nov 20 – 25, 2020
Prize: $600

Odyssey MB ReactNative Prototype 9 - Help and Marketing

Technologies: Android, Frontend, React Native, iOS
Dates: Nov 20 – 25, 2020
Prize: $600

Odyssey OLB ReactJS Responsive Prototype 7 - Finance Manager

Technologies: CSS, Frontend, ReactJS, TypeScript
Dates: Nov 8 – 13, 2020
Prize: $600

Odyssey MB ReactNative Prototype 7 - Finance Manager

Technologies: CSS, Frontend, React Native, TypeScript
Dates: Nov 8 – 13, 2020
Prize: $600

96h Odyssey OLB ReactJS Unit Tests 2

Technologies: ReactJS, TypeScript
Dates: Nov 8 – 12, 2020
Prize: $600

Odyssey Microservices - WSO2 Integration API PoC

Technologies: Java, Oauth, REST
Dates: Nov 4 – 9, 2020
Prize: $600

Odyssey MB ReactNative Prototype 6 - Account Dashboard 2

Technologies: Android, Frontend, React Native, TypeScript, iOS
Dates: Oct 31 – Nov 5, 2020
Prize: $600

Odyssey MB ReactNative Prototype 5 - Alerts

Technologies: Android, React Native, TypeScript, iOS
Dates: Oct 29 – Nov 3, 2020
Prize: $600

Odyssey OLB ReactJS Responsive Prototype 6 - Alerts

Technologies: ReactJS, TypeScript
Dates: Oct 29 – Nov 3, 2020
Prize: $600

Odyssey OLB ReactJS Responsive Prototype 5 - Account Dashboard 2

Technologies: CSS, ReactJS, TypeScript
Dates: Oct 28 – Nov 2, 2020
Prize: $600

72h Skyscraper - CM - MT Voluntary Closeout - Angular Prototype

Technologies: Angular 2+, TypeScript
Dates: Oct 20 – 23, 2020
Prize: $600

Odyssey MB ReactNative Prototype 3 - Account Dashboard 1

Technologies: React Native, TypeScript
Dates: Oct 16 – 21, 2020
Prize: $600

Odyssey OLB ReactJS Responsive Prototype 3 - Account Dashboard 1

Technologies: ReactJS, TypeScript
Dates: Oct 16 – 21, 2020
Prize: $600

72h Odyssey Microservices - Channel Activity History and Channel Router

Technologies: Java, Microservices, MySQL
Dates: Oct 18 – 21, 2020
Prize: $600

Odyssey MB ReactNative Appium Tests - Security Flow

Technologies: Appium, QA
Dates: Oct 15 – 20, 2020
Prize: $600

Odyssey OLB ReactJS Selenium Tests - Security Flow

Technologies: QA, ReactJS, Selenium
Dates: Oct 15 – 20, 2020
Prize: $600

Astellas - Data Import Tool Development

Technologies: Java, Java Application, MySQL, Spring
Dates: Oct 13 – 18, 2020
Prize: $600

72h Skyscraper - CM - MT Limit Setup - Angular Prototype

Technologies: Angular 2+, TypeScript
Dates: Oct 15 – 18, 2020
Prize: $600

96h Minerva Angular 9 Responsive UI Prototype 1

Technologies: Angular 2+, Bootstrap, CSS, HTML5, TypeScript
Dates: Oct 13 – 17, 2020
Prize: $600

Ognomy Phase 3 Secretary UI Prototype Part 2

Technologies: JSON, JavaScript, REST, ReactJS
Dates: Oct 7 – 12, 2020
Prize: $600

Odyssey Banking Microservices - Customer Profile and Registration

Technologies: Java, Microservices, MySQL, REST
Dates: Oct 3 – 10, 2020
Prize: $600

Odyssey Banking Microservices Unit Tests - SMS, Email and OTP

Technologies: JUnit, Java, MySQL
Dates: Oct 5 – 10, 2020
Prize: $600

Odyssey Banking Microservices - Authentication and Event Subscription Filtration

Technologies: Java, Microservices, MySQL, REST
Dates: Oct 3 – 8, 2020
Prize: $600

Odyssey MB ReactNative Unit Tests - Security & Dashboard 1

Technologies: React Native, TypeScript
Dates: Oct 2 – 7, 2020
Prize: $600

Odyssey OLB ReactJS Unit Tests - Security & Dashboard 1

Technologies: ReactJS, TypeScript
Dates: Sep 30 – Oct 5, 2020
Prize: $600

Odyssey OLB ReactJS Responsive Prototype - Security & Dashboard 2

Technologies: CSS, HTML5, ReactJS
Dates: Sep 24 – 29, 2020
Prize: $600

Odyssey MB ReactNative Prototype - Security & Dashboard 2

Technologies: Android, React Native, iOS
Dates: Sep 24 – 29, 2020
Prize: $600

Odyssey Banking Microservices - SMS, Email and OTP

Technologies: Docker, Java, Kubernetes, MySQL, REST
Dates: Sep 22 – 28, 2020
Prize: $600

Odyssey OLB ReactJS Responsive Prototype - Security & Dashboard 1

Technologies: Bootstrap, CSS, HTML5, ReactJS
Dates: Sep 12 – 17, 2020
Prize: $600

Odyssey MB ReactNative Prototype - Security & Dashboard 1

Technologies: Android, React Native, iOS
Dates: Sep 12 – 17, 2020
Prize: $600

Kids Watch - Sliding Keyboard Development

Technologies: Android, Java
Dates: Sep 4 – 9, 2020
Prize: $600

Kids Watch - Camera App Ideation

Technologies: Idea Generation
Dates: Aug 19 – Sep 7, 2020
Prize: $600

Odyssey Online and Mobile Banking Microservices Infrastructure

Technologies: Docker, Google Cloud, Java, Kubernetes, Microservices, REST
Dates: Aug 28 – Sep 3, 2020
Prize: $600

Kids Watch - Step Fitness App Ideation

Technologies: Idea Generation
Dates: Aug 12 – 24, 2020
Prize: $600

Journal iOS App

Technologies: Swift, Xcode
Dates: Aug 19 – 24, 2020
Prize: $600

Anabel Hospitality IoT Alert System Bug Hunt

Technologies: Angular 2+
Dates: Aug 19 – 21, 2020
Prize: $600

Digital Asset Platform Angular 10 Prototype 2

Technologies: Angular 2+, CSS, TypeScript
Dates: Jul 31 – Aug 5, 2020
Prize: $600

Anabel Hospitality IoT Alert System Integration Part 1

Technologies: Angular 2+, Golang, MongoDB, REST
Dates: Jul 29 – Aug 3, 2020
Prize: $600

72h Digital Asset Platform Angular 10 Integration 1

Technologies: Angular 2+, REST, TypeScript
Dates: Jul 30 – Aug 2, 2020
Prize: $600

Anabel Hospitality IoT Alert System REST API Part 1

Technologies: Golang, MongoDB, REST
Dates: Jul 17 – 22, 2020
Prize: $600

Ognomy Phase 3 Secretary UI Prototype Part 1

Technologies: JSON, JavaScript, REST, ReactJS
Dates: Jul 16 – 21, 2020
Prize: $600

Scout Phase 3 Integration Part 3

Technologies: Docker, HTML5, Node.js, PostgreSQL, Python, jQuery
Dates: Jul 11 – 17, 2020
Prize: $600

Digital Asset Platform Angular 10 Prototype 1

Technologies: Angular 2+, CSS, HTML5, TypeScript
Dates: Jul 11 – 16, 2020
Prize: $600

Ognomy Phase 3 Interoffice Messaging Integration

Technologies: JavaScript, MongoDB, Node.js, REST, ReactJS
Dates: Jul 7 – 12, 2020
Prize: $600

DX Development Tooling - SP Push Rewrite

Technologies: Docker, Node.js
Dates: Jul 6 – 11, 2020
Prize: $600

Scout Phase 3 Integration Part 2

Technologies: Docker, HTML5, Node.js, PostgreSQL, jQuery
Dates: Jul 2 – 8, 2020
Prize: $600

Anabel Hospitality IoT Alert System Angular 9 Prototype 1

Technologies: Angular 2+, CSS, HTML5, JSON, JavaScript
Dates: Jun 29 – Jul 5, 2020
Prize: $600

Ognomy Phase 3 Interoffice Messaging UI Prototype

Technologies: CSS, HTML5, JSON, ReactJS
Dates: Jun 25 – Jul 1, 2020
Prize: $600

Ognomy Phase 3 Admin Integration

Technologies: MongoDB, Node.js, REST, ReactJS
Dates: Jun 24 – 29, 2020
Prize: $600

Fax Management Solution Bug Hunt

Technologies: Angular 2+, CSS, JavaScript, Node.js, QA, QA - Hunt, REST
Dates: Jun 18 – 20, 2020
Prize: $600

Ognomy Phase 3 Admin UI Prototype

Technologies: CSS, HTML5, JSON, Node.js, ReactJS
Dates: Jun 13 – 19, 2020
Prize: $600

Scout Phase 3 Integration Part 1

Technologies: Docker, HTML5, JavaScript, Node.js, PostgreSQL, Python, jQuery
Dates: Jun 9 – 14, 2020
Prize: $600

Fax Management Solution Angular 9 Unit Tests

Technologies: Angular 2+
Dates: Jun 6 – 11, 2020
Prize: $600

Ognomy Phase 3 Mobile App Android Integration and Updates

Technologies: Android, React Native, iOS
Dates: Jun 4 – 7, 2020
Prize: $600

Scout Phase 3 Backend API Part 2

Technologies: Docker, Node.js, PostgreSQL, Python, REST
Dates: May 25 – 30, 2020
Prize: $600

96h Dragonnet dRISK ReactJS Prototype - Alert Pages 2

Technologies: CSS, HTML5, JSON, ReactJS
Dates: May 19 – 23, 2020
Prize: $600

Dragonnet dRISK ReactJS Prototype - Library and Alert Pages 1

Technologies: CSS, JSON, ReactJS
Dates: May 9 – 14, 2020
Prize: $600

Fax Management Solution Angular 9 UI Prototype

Technologies: Angular 2+, CSS, HTML5, TypeScript
Dates: May 8 – 13, 2020
Prize: $600

Scout Phase 3 Backend API Part 1

Technologies: Docker, Node.js, PostgreSQL, REST
Dates: May 7 – 12, 2020
Prize: $600

ABC Price Optimisation Web App - User Registration and User Management

Technologies: Angular 8, HTML5, JSON, TypeScript
Dates: May 9 – 12, 2020
Prize: $600

ABC Price Optimisation Web App - Geo Management

Technologies: Angular 8, HTML5, JSON, TypeScript
Dates: May 5 – 9, 2020
Prize: $600

Dragonnet dRisk - ReactJS Unit Tests

Technologies: ReactJS, TypeScript
Dates: Apr 30 – May 5, 2020
Prize: $600

Scraper Configuration UI - Chrome Extension Development

Technologies: JavaScript, REST, ReactJS
Dates: Apr 23 – 28, 2020
Prize: $600

48h Ognomy Phase 2 Web Portal - Patients View

Technologies: REST, ReactJS
Dates: Mar 31 – Apr 2, 2020
Prize: $600

96h Ognomy Phase 2 Mobile App Dark Theme Support

Technologies: Android, React Native, iOS
Dates: Mar 26 – 30, 2020
Prize: $600

96h DX Dashboard - Code Update

Technologies: Docker, Node.js
Dates: Mar 13 – 17, 2020
Prize: $600

96h Ognomy Phase 2 Mobile App React Native UI Challenge #2

Technologies: Android, REST, React Native, iOS
Dates: Mar 4 – 8, 2020
Prize: $600

72h Web Scraper Dev Tools Chrome Extension

Technologies: Chrome, JavaScript, REST
Dates: Feb 25 – 28, 2020
Prize: $600

Ognomy Phase 2 Mobile App React Native UI Challenge #1

Technologies: Android, JavaScript, React Native, iOS
Dates: Feb 22 – 27, 2020
Prize: $600

ABC Price Optimisation Web App - General and Price Admin Pages Prototype

Technologies: Angular 2+, CSS, HTML, JavaScript
Dates: Feb 8 – 13, 2020
Prize: $600

72h Quantum UI Prototype Challenge

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Feb 6 – 10, 2020
Prize: $600

ABC Price Optimisation Web App - Dynamic Table Component

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Jan 31 – Feb 5, 2020
Prize: $600

96h Ognomy MVP Web Portal Integration Challenge

Technologies: MongoDB, Node.js, REST, ReactJS
Dates: Jan 29 – Feb 2, 2020
Prize: $600

Ognomy MVP Mobile App React Native UI Challenge

Technologies: Android, HTML5, JavaScript, iOS
Dates: Jan 25 – 31, 2020
Prize: $600

Video Call Proof-of-Concept Using VSEE

Technologies: Swift, iOS
Dates: Jan 23 – 29, 2020
Prize: $600

Ognomy MVP Backend API Challenge

Technologies: MongoDB, Node.js, REST
Dates: Jan 17 – 24, 2020
Prize: $600

72h Ognomy MVP Web Portal UI Prototype Challenge

Technologies: CSS, HTML5, JavaScript, ReactJS
Dates: Jan 17 – 20, 2020
Prize: $600

Emerald - Hub Application Prototype Challenge

Technologies: CSS, HTML5, JavaScript, ReactJS
Dates: Jan 7 – 12, 2020
Prize: $600

DX Development Tooling - Code Update

Technologies: Docker, Node.js
Dates: Nov 30 – Dec 5, 2019
Prize: $600

PDF Converter API Challenge

Technologies: Node.js, Python
Dates: Nov 22 – 27, 2019
Prize: $600

24H Media Library Image Processor #3

Technologies: Node.js, REST, TypeScript
Dates: Nov 22 – 23, 2019
Prize: $600

API Gateway Design Ideation

Technologies: REST
Dates: Nov 8 – 15, 2019
Prize: $600

96H Remote Resource VSCode Extension Development

Technologies: JSON, JavaScript, REST, TypeScript
Dates: Oct 22 – 26, 2019
Prize: $600

Mud Log Search Tool - Bounding Box Feature

Technologies: Angular 2+, Java, REST, SQL Server, Spring
Dates: Sep 30 – Oct 5, 2019
Prize: $600

ABC - MPS Portal Prototype Updates

Technologies: JavaScript, ReactJS
Dates: Sep 20 – 26, 2019
Prize: $600

Mud Log Search UI Services & Integration

Technologies: Angular 2+, Java, REST, SQL Server, Spring
Dates: Sep 17 – 25, 2019
Prize: $600

IFA Onboarding Desktop Admin React Prototype Challenge #1

Technologies: CSS, HTML5, JavaScript, ReactJS
Dates: Aug 24 – Sep 1, 2019
Prize: $600

ABB RCS Angular Prototype - Harmonised Data Tooling

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Jul 26 – Aug 1, 2019
Prize: $600

ABB RCS Angular Prototype - Widgets 1

Technologies: Angular 2+, HTML5, JavaScript
Dates: Jul 23 – 31, 2019
Prize: $600

Product Information Search Service Data Conversion Processor

Technologies: Docker, Java, MySQL, Spring
Dates: Jul 26 – 31, 2019
Prize: $600

Media Library UI Challenge #1

Technologies: CSS, HTML5, JavaScript, ReactJS
Dates: Jul 22 – 29, 2019
Prize: $600

ABB RCS Angular Prototype - IE and KB

Technologies: Angular 2+, HTML, JavaScript
Dates: Jul 20 – 26, 2019
Prize: $600

Phrase Annotation Cloud Function Development

Technologies: Java, MySQL, SQL Server
Dates: Jul 19 – 24, 2019
Prize: $600

Product Information Search Service Web Crawler

Technologies: Docker, Java, MySQL, Spring
Dates: Jul 13 – 18, 2019
Prize: $600

ABB RCS Angular Prototype - CI

Technologies: Angular 2+, CSS, HTML, JavaScript
Dates: Jul 11 – 18, 2019
Prize: $600

96h ABB RCS Angular Prototype - Notifications

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Jul 11 – 15, 2019
Prize: $600

OCR Extraction Cloud Function Development

Technologies: Java, MySQL, SQL Server
Dates: Jul 5 – 10, 2019
Prize: $600

72H Media Library Image Processor #2

Technologies: Node.js, REST, TypeScript
Dates: Jul 4 – 7, 2019
Prize: $600

Media Library API Challenge #1

Technologies: Node.js, PostgreSQL, REST, TypeScript
Dates: Jun 27 – Jul 3, 2019
Prize: $600

ABB RCS Angular Prototype - Advanced Policies Formula Editor

Technologies: Angular 2+, Bootstrap, CSS, HTML5, JavaScript
Dates: Jun 10 – 15, 2019
Prize: $600

Media Library Config Service

Technologies: JavaScript, Node.js, REST, TypeScript
Dates: Jun 8 – 13, 2019
Prize: $600

Pictone iOS Prototype App Development Part 2

Technologies: Swift, iOS
Dates: Jun 6 – 11, 2019
Prize: $600

ABB RCS Angular Prototype - Policy General & Assessment

Technologies: Angular 2+, Bootstrap, CSS, HTML5, JavaScript
Dates: Jun 5 – 10, 2019
Prize: $600

Dragonet - Worksheet App Bug Fixes

Technologies: .NET, Angular 2+, Docker, JavaScript, REST, SQL
Dates: May 30 – Jun 5, 2019
Prize: $600

QR Scan Counterfeit iOS Prototype App Development

Technologies: JSON, Swift, Xcode, iOS
Dates: May 28 – Jun 2, 2019
Prize: $600

Media Library React Component Library

Technologies: CSS, JavaScript, ReactJS, TypeScript
Dates: May 24 – 30, 2019
Prize: $600

OpenFormula to Javascript Converter Challenge 1

Technologies: JavaScript, Node.js
Dates: May 22 – 28, 2019
Prize: $600

Quartz Energy - Mud Logs - OCR with Google Vision API

Technologies: Data Science, Java, SQL Server
Dates: May 17 – 22, 2019
Prize: $600

RCS Mobile API Design Challenge

Technologies: C#, PostgreSQL, REST
Dates: May 2 – 10, 2019
Prize: $600

Pictone iOS Prototype App Development

Technologies: Swift, Xcode, iOS
Dates: Apr 30 – May 5, 2019
Prize: $600

Dragonet - Worksheet App Bug Hunt

Technologies: Angular 2+, HTML5, JavaScript, QA
Dates: Apr 8 – 10, 2019
Prize: $600

ABB RCS Angular Prototype - Execution

Technologies: Angular 2+, Bootstrap, CSS, JavaScript
Dates: Apr 1 – 7, 2019
Prize: $600

Web Scraper Project 08 - Avoid Attack Detection

Technologies: Java, MySQL, REST
Dates: Mar 27 – Apr 1, 2019
Prize: $600

Dragonet - Worksheet Integration Challenge

Technologies: .NET, Angular 2+, Docker, HTML5, JavaScript, REST, SQL
Dates: Mar 22 – 27, 2019
Prize: $600

ABB RCS Angular Prototype - SWMS

Technologies: Angular 2+, Bootstrap, CSS, JavaScript
Dates: Mar 20 – 26, 2019
Prize: $600

96h! Dragonet - Worksheet API Implementation Challenge

Technologies: .NET, C#, REST, SQL
Dates: Mar 13 – 17, 2019
Prize: $600

Web Scraper Project 04 - Multiple Accounts Support

Technologies: HTML5, Java, JavaScript, MySQL, REST
Dates: Mar 5 – 10, 2019
Prize: $600

Dragonet - Worksheet Angular UI Prototype Challenge

Technologies: Angular 2+, CSS, HTML, JavaScript
Dates: Feb 26 – Mar 4, 2019
Prize: $600

SLD Editor Challenge #9

Technologies: Angular 2+, CSS, HTML5
Dates: Feb 21 – 26, 2019
Prize: $600

Autocognita - Literacy Mobile Application Web Admin Portal Integration

Technologies: Angular 2+, JavaScript, REST
Dates: Feb 11 – 16, 2019
Prize: $600

Autocognita - Literacy Mobile Application API 2

Technologies: Java, MongoDB, REST
Dates: Feb 11 – 16, 2019
Prize: $600

Autocognita - Literacy Mobile Application API 1

Technologies: Java, MongoDB, REST
Dates: Jan 30 – Feb 4, 2019
Prize: $600

Autocognita - Literacy Android App UI Build 2

Technologies: Android, Java
Dates: Dec 26, 2018 – Jan 1, 2019
Prize: $600

ABB RCS Angular Prototype Challenge #2

Technologies: Angular 2+, Bootstrap, CSS, HTML5, JavaScript
Dates: Dec 17 – 23, 2018
Prize: $600

Factory Fabric DB Validation Command Line Tool

Technologies: Java Application, SQL
Dates: Dec 16 – 21, 2018
Prize: $600

SLD Editor Challenge #3

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Dec 4 – 10, 2018
Prize: $600

METI Integration Challenge #1

Technologies: Angular 2+, CSS, HTML5, Java, JavaScript, MySQL, REST
Dates: Nov 26 – Dec 1, 2018
Prize: $600

SLD Editor Challenge #2

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Nov 19 – 24, 2018
Prize: $600

METI - Case Studies Responsive Application REST API #2

Technologies: Java, MySQL, REST, Spring
Dates: Nov 11 – 16, 2018
Prize: $600

SLD Editor Challenge #1

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Nov 6 – 11, 2018
Prize: $600

METI - Case Studies Responsive Application REST API

Technologies: Java, MySQL, REST, Spring
Dates: Oct 27 – Nov 1, 2018
Prize: $600

METI - Case Studies Responsive Application Desktop & Tablet Prototype

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Oct 24 – 31, 2018
Prize: $600

PM Applet Angular 6 Prototype Challenge #1

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Oct 4 – 11, 2018
Prize: $600

VRP Problem / Solver Characteristics Analysis

Technologies: Data Science
Dates: Sep 13 – 20, 2018
Prize: $600

Website Scraper Challenge

Technologies: Java, Java Application
Dates: Sep 7 – 13, 2018
Prize: $600

Qlik Sense Reports Challenge #2 - Top 10 Reports

Technologies: JavaScript
Dates: Sep 6 – 11, 2018
Prize: $600

Qlik Sense Reports Challenge #3 - Data Aggregation

Technologies: JavaScript
Dates: Sep 6 – 10, 2018
Prize: $600

Qlik Sense Reports Challenge #1

Dates: Aug 29 – Sep 4, 2018
Prize: $600

Quartz Energy - Log Digitization Automated Depth Registration with OCR

Technologies: Java
Dates: Aug 3 – 17, 2018
Prize: $600

ABC - Missing Details Portal Bug Hunt

Technologies: Node.js, QA, ReactJS, SQL Server
Dates: Aug 13 – 15, 2018
Prize: $600

John Hancock - Innovation Portal Bug Hunt

Technologies: Angular 2+, Node.js, QA, REST
Dates: Aug 4 – 8, 2018
Prize: $600

Quartz Energy - Log Digitization Automated Depth Registration with OCR

Technologies: Data Science, Java
Dates: Jul 24 – 31, 2018
Prize: $600

ABC - Missing Details Portal REST API Implementation

Technologies: Node.js, REST, SQL Server
Dates: Jul 24 – 30, 2018
Prize: $600

John Hancock - Innovation Portal Test Cases Execution (QAAS)

Technologies: Angular 2+, QA, SQL Server
Dates: Jul 16 – 19, 2018
Prize: $600

ABC - Missing Details Portal Architecture

Technologies: Node.js, REST, SQL Server
Dates: Jul 10 – 15, 2018
Prize: $600

John Hancock - Innovation Portal QAAS Test Cases Writing

Technologies: Angular 2+, Node.js, QA, REST
Dates: Jul 7 – 12, 2018
Prize: $600

John Hancock - Innovation Portal Integration

Technologies: Angular 2+, JavaScript, Node.js, REST, SQL Server
Dates: Jun 22 – 28, 2018
Prize: $600

John Hancock - Innovation Portal Backend Services

Technologies: Node.js, REST, SQL
Dates: Jun 13 – 18, 2018
Prize: $600

Quartz Energy Well Log Alignment App Flexible UI Implementation

Technologies: Java Application
Dates: May 8 – 14, 2018
Prize: $600

[96h] Submission App Material UI Conversion and API Integration

Technologies: CSS, HTML5, JavaScript, REST, ReactJS
Dates: May 5 – 9, 2018
Prize: $600

[84H] Micro-services Implementation - Projects API

Technologies: Java, MySQL, REST
Dates: May 2 – 5, 2018
Prize: $600

John Hancock - Payroll Assist Application Bug Hunt

Technologies: .NET, C#, QA, REST, SQL Server
Dates: Apr 30 – May 2, 2018
Prize: $600

SaxoTraderGO - iOS iPad App Siri Integration

Technologies: REST, Swift
Dates: Apr 27 – May 2, 2018
Prize: $600

Talent Management .NET Web App + Backend Architecture Challenge

Technologies: .NET, HTML5, PostgreSQL, REST
Dates: Apr 17 – 25, 2018
Prize: $600

SaxoTraderGO - iOS iPad App Integration

Technologies: REST, Swift
Dates: Apr 18 – 23, 2018
Prize: $600

John Hancock - Payroll Assist Application Integration

Technologies: .NET, Angular 2+, C#, REST
Dates: Apr 17 – 22, 2018
Prize: $600

Admin App - Implement Simple Admin Flow for Spigit

Technologies: Angular.js (1.0), REST
Dates: Apr 14 – 20, 2018
Prize: $600

Quartz Energy Well Information Scraping Tool UI Prototype

Technologies: Angular 2+, CSS, HTML5, JavaScript
Dates: Mar 28 – Apr 3, 2018
Prize: $600

John Hancock - Payroll Assist Application File Mapping & Reformatting API

Technologies: .NET, C#, REST
Dates: Mar 20 – Apr 2, 2018
Prize: $600

New Sharing Economy Service for Housekeepers - UI prototyping challenge series #1

Technologies: CSS, HTML5, JavaScript
Dates: Mar 20 – 26, 2018
Prize: $600

72h Admin App - User SSO Login Management

Technologies: Angular.js (1.0), CSS, HTML, JavaScript, REST
Dates: Mar 22 – 25, 2018
Prize: $600

Mud Log Image Extraction Tool Bug Fixes and Code Clean Up

Technologies: Java
Dates: Mar 14 – 19, 2018
Prize: $600

SaxoTraderGO - iOS iPad (Mini) Prototype App

Technologies: Swift, iOS
Dates: Mar 12 – 18, 2018
Prize: $600

Quartz Energy - Numpy Cube Visualizer Tool Update

Technologies: Python
Dates: Mar 11 – 16, 2018
Prize: $600

SoftBank - Technology-Enabled-Service/Feature Ideation

Dates: Mar 1 – 14, 2018
Prize: $600

John Hancock - 401(k) Payroll Assist Application File Upload & Validation API

Technologies: .NET, C#, REST
Dates: Mar 7 – 12, 2018
Prize: $600

Quartz Energy Well Information Web Scraping Challenge

Technologies: Java, Python
Dates: Mar 1 – 8, 2018
Prize: $600

Quartz Energy Well Log Alignment Java Desktop Application

Technologies: Java, Java Application
Dates: Feb 27 – Mar 4, 2018
Prize: $600

MyDiary - Personal Insight App UI Prototype

Technologies: CSS, HTML5, JavaScript
Dates: Feb 14 – 20, 2018
Prize: $600

48h Mud Log Image Extraction Tool - Export Image Capability

Technologies: Java, MySQL
Dates: Feb 3 – 5, 2018
Prize: $600

John Hancock - PCAT Enhancements (Enhanced View and Added Columns) Challenge

Technologies: .NET, Angular.js (1.0), C#, REST, SQL Server
Dates: Jan 30 – Feb 4, 2018
Prize: $600
1st

Android Testing Automation Tool Ideation

Technologies: Android, Java, QA
Dates: Jan 20 – 28, 2018
Prize: $1,000

Android Application Code Coverage Ideation

Technologies: Android, Java
Dates: Jan 20 – 28, 2018
Prize: $600

Quartz Energy Geosteer Assist - Gamma Ray-Assisted Tops Identification

Technologies: Java
Dates: Jan 16 – 24, 2018
Prize: $600

72h Admin App - Group and User Management Enhancements

Technologies: Angular.js (1.0), CSS, HTML, JavaScript, REST
Dates: Jan 14 – 17, 2018
Prize: $600

Travel Ticketing System Mobile App Ionic Prototype

Technologies: Android, CSS, HTML5, Ionic, JavaScript, iOS
Dates: Jan 4 – 10, 2018
Prize: $600

72h Admin App Bulk User Import

Technologies: Angular.js (1.0), CSS, HTML5, REST
Dates: Dec 26 – 29, 2017
Prize: $600

QED - SHARE Webapp Minimal Implementation

Technologies: CSS, HTML5, JavaScript, MongoDB, Node.js, REST
Dates: Dec 19 – 24, 2017
Prize: $600

John Hancock - Development Feedback Tool Bug Fixes Assembly

Technologies: .NET, Angular 2+, C#, REST, SQL Server
Dates: Dec 15 – 20, 2017
Prize: $600

Social Bike Owner App iOS Bug Hunt

Technologies: REST, Swift, iOS
Dates: Dec 19 – 20, 2017
Prize: $600

Quartz Energy Geosteer Assist - Relative Position Reporting

Technologies: Java
Dates: Dec 12 – 17, 2017
Prize: $600

72h QED - ODKM Webapp Minimal Implementation

Technologies: Angular 2+, CSS, HTML5, JavaScript, MongoDB, Node.js, REST
Dates: Dec 13 – 16, 2017
Prize: $600

John Hancock - Development Feedback Tool Bug Hunt

Technologies: .NET, Angular 2+, C#, SQL Server
Dates: Dec 7 – 14, 2017
Prize: $600

72h Admin App Challenge Fee and Review Management

Technologies: Angular.js (1.0), CSS, HTML5, REST
Dates: Dec 6 – 9, 2017
Prize: $600

Social Bike Owner App iOS - Fixes and Enhancements Part 1

Technologies: REST, Swift, iOS
Dates: Nov 26 – Dec 1, 2017
Prize: $600

Quartz Energy Geosteer Assist - Formation Interpolation

Technologies: Java
Dates: Nov 23 – 29, 2017
Prize: $600

John Hancock - Development Feedback Tool Integration

Technologies: .NET, Angular 2+, C#, REST, SQL Server
Dates: Nov 23 – 28, 2017
Prize: $600

QED - Learning Library Mobile App Integration

Technologies: Ionic, JavaScript, MongoDB, Node.js, REST
Dates: Nov 13 – 19, 2017
Prize: $600

John Hancock - Development Feedback Tool Integration - Employee Features

Technologies: .NET, Angular 2+, C#, REST, SQL Server
Dates: Nov 8 – 17, 2017
Prize: $600

72h TC Identity Service API Enhancements

Technologies: Java, REST, SQL
Dates: Nov 9 – 12, 2017
Prize: $600

48h TC Admin App - Mobile Support

Technologies: Angular.js (1.0), CSS, HTML5
Dates: Oct 28 – 30, 2017
Prize: $600

Social Bike Owner App iOS - Integration Part 2

Technologies: REST, Swift, iOS
Dates: Oct 21 – 26, 2017
Prize: $600

Holmes Negative News Web App Integration

Technologies: Angular 2+, CSS, HTML5, JavaScript, MongoDB, Node.js, REST
Dates: Oct 21 – 26, 2017
Prize: $600

John Hancock - KPI Scorecard Tool Bug Fixes and Enhancements Part 2

Technologies: .NET, Active Directory, Angular.js (1.0), C#, REST, SQL Server
Dates: Oct 17 – 25, 2017
Prize: $600

QED - Learning Library Mobile Application Backend Services

Technologies: MongoDB, Node.js, REST
Dates: Oct 13 – 18, 2017
Prize: $600

Holmes Negative News Search API Filter Enhancements

Technologies: MongoDB, Node.js, REST
Dates: Oct 13 – 17, 2017
Prize: $600

Social Bike Owner App iOS - Integration Part 1

Technologies: REST, Swift, iOS
Dates: Oct 7 – 15, 2017
Prize: $600

Admin App Challenge Fee and Review Management API

Technologies: Java, REST, SQL
Dates: Oct 10 – 15, 2017
Prize: $600

John Hancock - Development Feedback Tool API Implementation

Technologies: .NET, C#, REST
Dates: Oct 10 – 15, 2017
Prize: $600

Social Bike Owner App iOS - Backend Services Part 2

Technologies: Java, PostgreSQL, REST
Dates: Oct 7 – 12, 2017
Prize: $600

John Hancock - KPI Scorecard Tool Bug Fixes and Enhancements Part 1

Technologies: .NET, Active Directory, Angular.js (1.0), C#, REST, SQL Server
Dates: Oct 6 – 12, 2017
Prize: $600

Holmes Negative News Web API

Technologies: MongoDB, Node.js, REST
Dates: Oct 5 – 8, 2017
Prize: $600

72h Holmes Negative News Data Retrieve API

Technologies: MongoDB, Node.js, REST
Dates: Oct 3 – 6, 2017
Prize: $600

Social Bike Owner App iOS - Backend Services Part 1

Technologies: Java, PostgreSQL, REST
Dates: Sep 27 – Oct 3, 2017
Prize: $600

Holmes Negative News Search API

Technologies: MongoDB, Node.js, REST
Dates: Sep 27 – Oct 2, 2017
Prize: $600

Social Bike Owner App iOS - Prototype App Part 3

Technologies: Swift, iOS
Dates: Sep 26 – Oct 1, 2017
Prize: $600

48h Holmes Negative News App UI Prototype

Technologies: Angular 2+, CSS, HTML5
Dates: Sep 18 – 20, 2017
Prize: $600

Social Bike Owner App - iOS Prototype App Part 2

Technologies: Swift, iOS
Dates: Sep 12 – 18, 2017
Prize: $600

Social Bike Owner App - Architecture

Technologies: Java, PostgreSQL, REST
Dates: Sep 10 – 15, 2017
Prize: $600

DKS Backend API and Frontend Integration Assembly

Technologies: Angular 2+, HTML5, Java, REST, SQL
Dates: Sep 4 – 11, 2017
Prize: $600

48h TC Identity Service - User Load Log API

Technologies: Java, REST, SQL
Dates: Sep 4 – 6, 2017
Prize: $600

Social Bike Owner App - iOS Prototype App Part 1

Technologies: Swift, iOS
Dates: Aug 31 – Sep 5, 2017
Prize: $600

QED - Learning Library Mobile Application Ionic Prototype

Technologies: Android, HTML5, Ionic, JavaScript, iOS
Dates: Aug 20 – 26, 2017
Prize: $600

John Hancock - KPI Scorecard Release Assembly

Technologies: .NET, Active Directory, Angular.js (1.0), C#, REST, SQL Server
Dates: Aug 12 – 17, 2017
Prize: $600

Fujitsu - DPM Project Details Prototype

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Aug 9 – 15, 2017
Prize: $600

John Hancock - Development Feedback Tool API Design and Swagger Documentation

Technologies: .NET, ASP.NET Core , Angular 2+, C#, CSS, HTML, REST, SQL Server
Dates: Aug 5 – 10, 2017
Prize: $600

John Hancock - KPI Scorecard Bug Hunt

Technologies: .NET, Angular.js (1.0), CSS, HTML5, JavaScript, REST
Dates: Aug 5 – 7, 2017
Prize: $600

36h Fujitsu - DPM Project List Prototype

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Aug 4 – 6, 2017
Prize: $600

Quartz: NPT Correlated Dummy Data Builder

Technologies: JavaScript, Python
Dates: Jul 30 – Aug 5, 2017
Prize: $600

Commodity OCR Bakeoff

Technologies: AWS, Cloud Foundry, Cognitive, Data Science, Google, HPE Haven OnDemand, Heroku, IBM Cloud, IBM Cognitive, IBM Watson, Python
Dates: Jul 27 – 31, 2017
Prize: $600

Scout Application Web Integration - ECM Summaries

Technologies: HTML5, JavaScript, Node.js, REST
Dates: Jul 21 – 27, 2017
Prize: $600

Quartz Energy Mud Log OCR Optimization

Technologies: Data Science, MySQL, Python
Dates: Jul 19 – 26, 2017
Prize: $600

48h Admin App - Search and Sorting on Roles and Groups Pages

Technologies: Angular.js (1.0), CSS, JavaScript, REST
Dates: Jul 12 – 14, 2017
Prize: $600

MATCARDS Comamndline Tool

Technologies: Java, Java Application
Dates: Jun 27 – Jul 5, 2017
Prize: $600

Scout Application Backend Services - ECM Summaries and Analysis Results

Technologies: Node.js, REST
Dates: Jun 28 – Jul 3, 2017
Prize: $600

Scout Application Backend Services - New ECM and Calculator

Technologies: Node.js, REST
Dates: Jun 26 – Jul 1, 2017
Prize: $600

96h John Hancock - KPI Scorecard Tab Updates

Technologies: .NET, Active Directory, Angular.js (1.0), C#, REST, SQL Server
Dates: Jun 20 – 24, 2017
Prize: $600

48h Admin App - Roles Management Enhancements

Technologies: Angular.js (1.0), CSS, JavaScript, REST
Dates: Jun 18 – 20, 2017
Prize: $600

48h TC Identity Service - Groups API Enhancements

Technologies: Java, REST, SQL
Dates: Jun 18 – 20, 2017
Prize: $600

JH Cloud Delivery Reporting - Usage Records and Cost Center Info Service

Technologies: REST
Dates: Jun 7 – 14, 2017
Prize: $600

Best Buy Bug Hunt v1.0

Technologies: CSS, HTML5, HTTP, JavaScript
Dates: Jun 8 – 12, 2017
Prize: $600

72h TC Identity Service - Roles Management API Enhancements

Technologies: Java, REST, SQL
Dates: Jun 8 – 11, 2017
Prize: $600

48h Admin App - Remove Bower Dependency

Technologies: Angular.js (1.0), CSS, JavaScript, REST
Dates: Jun 8 – 10, 2017
Prize: $600

48h Admin App - Group Membership Management

Technologies: Angular.js (1.0), CSS, JavaScript, REST
Dates: Jun 8 – 10, 2017
Prize: $600

72h JH Cloud Delivery Reporting - Apply Cost Center Tags

Technologies: REST
Dates: Jun 7 – 10, 2017
Prize: $600

72h Admin App - Replace Login Implementation

Technologies: Angular.js (1.0), CSS, JavaScript, REST
Dates: May 31 – Jun 3, 2017
Prize: $600

48h TC Identity Service Swagger Documentation

Dates: May 31 – Jun 2, 2017
Prize: $600

HPE LPC - Mentor Me - Localized App Bug Bash

Technologies: Android, Angular.js (1.0), CSS, HTML5, JPA, Java, MySQL, REST
Dates: May 13 – 29, 2017
Prize: $600

Admin App - Replace Login Implementation

Technologies: Angular.js (1.0), CSS, JavaScript, REST
Dates: May 24 – 28, 2017
Prize: $600

48h TC Identity Service - Group and Membership Management API

Technologies: Java, REST, SQL
Dates: May 26 – 28, 2017
Prize: $600

John Hancock - KPI Scorecard Bug Fixes

Technologies: .NET, ASP.NET, Active Directory, Angular.js (1.0), C#, REST, SQL Server
Dates: May 23 – 27, 2017
Prize: $600

Meeting Time Analysis

Technologies: C#, Node.js
Dates: May 13 – 18, 2017
Prize: $600

Office 365 Calendar API PoC

Technologies: .NET, C#, REST
Dates: May 13 – 18, 2017
Prize: $600

HPE Living Progress Challenge - WWF - Detect IT Maintenance Phase Bug Bash

Technologies: .NET, ASP.NET, Angular.js (1.0), REST, SQL Server, Vertica
Dates: Apr 21 – May 11, 2017
Prize: $600

Admin App Permission Management - Roles

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: May 4 – 9, 2017
Prize: $600

96h HPE LPC - Mentor Me - Front-End Integration with Localized Services

Technologies: Android, Ionic, Java, REST
Dates: Apr 21 – 25, 2017
Prize: $600

John Hancock - KPI Scorecard Updates Part 2

Technologies: .NET, ASP.NET, Active Directory, Angular.js (1.0), C#, REST, SQL Server
Dates: Apr 18 – 24, 2017
Prize: $600

HPE Living Progress Challenge - WWF - Detect IT v1.1 Bug Bash

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, CSS, HTML5, JavaScript, SQL Server
Dates: Apr 4 – 20, 2017
Prize: $600

HPE LPC - Mentor Me - Services Localization and Schema Cleanup

Technologies: Java, Maven, MySQL, REST
Dates: Apr 7 – 14, 2017
Prize: $600

John Hancock - KPI Scorecard Updates Part 1

Technologies: .NET, ASP.NET, Active Directory, C#, CSS, REST, SQL Server
Dates: Apr 6 – 13, 2017
Prize: $600

SoftBank - Blockchain New Service Ideation Challenge

Technologies: Data Science
Dates: Mar 31 – Apr 10, 2017
Prize: $600

SoftBank - Motivating the Miners in Blockchain Ideation Challenge

Technologies: Data Science
Dates: Mar 27 – Apr 6, 2017
Prize: $600

HPE Living Progress Challenge - Mentor Me - Bug Bash

Technologies: Android, Angular.js (1.0), CSS, HTML5, JPA, Java, MySQL, REST
Dates: Feb 25 – Mar 29, 2017
Prize: $600

SoftBank - Blockchain Ideation and High Level Architecture For New Service

Technologies: Data Science
Dates: Mar 17 – 26, 2017
Prize: $600

John Hancock - KPI Scorecard Bug Hunt

Technologies: .NET, Angular.js (1.0), C#, REST, SQL Server
Dates: Mar 19 – 22, 2017
Prize: $600

Fujitsu - Prototype of Web-based visual editor for specific purpose diagrams

Technologies: CSS, HTML5, JavaScript
Dates: Mar 13 – 17, 2017
Prize: $600

HPE Living Progress Challenge - WWF - Detect IT Bug Bash 2

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, JSON, REST, SQL Server
Dates: Feb 25 – Mar 15, 2017
Prize: $600

HPE Living Progress Challenge - WWF - Detect IT Bug Bash 1

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, JSON, SQL Server, Vertica
Dates: Feb 10 – 24, 2017
Prize: $600

48h Admin App - Tags Management

Technologies: Angular.js (1.0), JavaScript, Node.js, REST
Dates: Feb 22 – 24, 2017
Prize: $600

John Hancock - KPI Scorecard Frontend Integration 2 Assembly

Technologies: .NET, ASP.NET, Active Directory, Angular.js (1.0), C#, HTML5, REST, SQL Server
Dates: Feb 6 – 13, 2017
Prize: $600

Admin App - Billing Account Management

Technologies: Angular.js (1.0), JavaScript, Node.js, REST
Dates: Feb 8 – 13, 2017
Prize: $600

John Hancock - Project Snapshot Azure AD Authentication and Permissions Management Assembly

Technologies: .NET, Active Directory, C#, CSS, HTML5, IIS, JavaScript, REST, SQL Server
Dates: Feb 2 – 7, 2017
Prize: $600

John Hancock - Coeus Security Updates and KPI Scorecard Frontend Integration 1 Assembly

Technologies: .NET, ASP.NET, Active Directory, Angular.js (1.0), C#, JavaScript, REST, SQL Server
Dates: Jan 15 – 21, 2017
Prize: $600

Living Progress - Build - WWF - Data Download and Security Enhancements

Technologies: .NET, Angular.js (1.0), C#, CSS, JavaScript, REST, SQL Server
Dates: Jan 3 – 8, 2017
Prize: $600

John Hancock - KPI Scorecard Backend Assembly

Technologies: .NET, Active Directory, C#, REST, SQL Server
Dates: Dec 28, 2016 – Jan 2, 2017
Prize: $600

Living Progress - Build - Mentor ME - Android/Ionic Mentor Screens Mobile Services Integration

Technologies: Android, Angular.js (1.0), CSS, HTML5, JPA, Java, JavaScript, MySQL, REST
Dates: Dec 22 – 31, 2016
Prize: $600

John Hancock - Project Coeus Admin Release Assembly

Technologies: .NET, ASP.NET, Active Directory, Angular.js (1.0), C#, JavaScript, REST, SQL Server
Dates: Dec 22 – 27, 2016
Prize: $600

Living Progress - Build - WWF - Results Display and Forum Publishing

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, CSS, JavaScript, REST, SQL Server
Dates: Dec 16 – 24, 2016
Prize: $600

Living Progress - Build - WWF - Dashboard Development

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, JavaScript, REST, SQL Server, Vertica
Dates: Dec 19 – 24, 2016
Prize: $600

Living Progress - Build - WWF - Alerts Development

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, HTML5, JavaScript, REST, SQL Server
Dates: Dec 15 – 20, 2016
Prize: $600

SRT - Bug Hunt

Technologies: Angular.js (1.0), Java, JavaScript, PostgreSQL, SQL
Dates: Dec 17 – 19, 2016
Prize: $600

Engage Together - Dashboard UI Prototype

Technologies: CSS, HTML5, JavaScript
Dates: Dec 13 – 18, 2016
Prize: $600

John Hancock - Project Coeus Admin Features Bug Hunt

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, REST, SQL Server
Dates: Dec 16 – 17, 2016
Prize: $600

John Hancock - KPI Scorecard Architecture

Technologies: .NET, ASP.NET, Active Directory, Angular.js (1.0), C#, IIS, REST, SQL Server
Dates: Dec 10 – 16, 2016
Prize: $600

John Hancock - Project Snapshot Frontend Assembly

Technologies: .NET, Angular.js (1.0), C#, HTML5, IIS, REST, SQL Server
Dates: Dec 7 – 12, 2016
Prize: $600

SRT - Announcements and Reporting Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL, REST
Dates: Dec 1 – 9, 2016
Prize: $600

Living Progress - Build - WWF - Real Time Search and Results Display Part 2

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, CSS, JavaScript, REST, SQL Server, Vertica
Dates: Dec 5 – 9, 2016
Prize: $600

John Hancock - Project Coeus Admin Frontend Assembly Part 2

Technologies: .NET, ASP.NET, Active Directory, Angular.js (1.0), C#, CSS, HTML5, JavaScript, REST, SQL Server
Dates: Dec 2 – 9, 2016
Prize: $600

SRT - Dashboard Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL, REST
Dates: Dec 2 – 8, 2016
Prize: $600

96h Softbank - Web Scraping API Enhancements

Technologies: Node.js, REST
Dates: Dec 2 – 6, 2016
Prize: $600

Living Progress - Build - Mentor ME - Android/Ionic Mentee Screens Services Integration

Technologies: Android, Angular.js (1.0), HTML5, JPA, Java, JavaScript, MySQL, REST
Dates: Nov 28 – Dec 5, 2016
Prize: $600

Admin App - TC API Challenges and Members Admin API

Technologies: Java, PostgreSQL, REST, SQL
Dates: Nov 28 – Dec 3, 2016
Prize: $600

John Hancock - Project Snapshot Backend REST API Assembly

Technologies: .NET, Angular.js (1.0), C#, IIS, REST, SQL Server
Dates: Nov 24 – 30, 2016
Prize: $600

Living Progress - Build - WWF - Forum Development

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, HTML5, IIS, SQL Server, Windows Server
Dates: Nov 19 – 28, 2016
Prize: $600

Living Progress - Build - WWF - Real Time Search Implementation and Results Display

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, CSS, HTML5, REST, SQL, SQL Server, Vertica
Dates: Nov 17 – 24, 2016
Prize: $600

72h! Topcoder Project Service Search Enhancements v2

Technologies: Node.js, PostgreSQL, REST
Dates: Nov 19 – 22, 2016
Prize: $600

John Hancock - Project Coeus Admin Frontend Assembly Part 1

Technologies: .NET, ASP.NET, Active Directory, Angular.js (1.0), C#, CSS, HTML5, REST, SQL Server
Dates: Nov 15 – 20, 2016
Prize: $600

Topcoder Connect Notifications

Technologies: Node.js
Dates: Nov 9 – 16, 2016
Prize: $600

72h! Topcoder Project Service Search Enhancements

Technologies: Node.js, REST
Dates: Nov 11 – 14, 2016
Prize: $600

Living Progress - Build - Mentor ME - Remote Services Implementation

Technologies: Java, MySQL, REST
Dates: Nov 7 – 13, 2016
Prize: $600

John Hancock - Project Snapshot Architecture

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, HTML5, IIS, REST, SQL Server
Dates: Nov 5 – 10, 2016
Prize: $600

Living Progress - Build - WWF - Web Services and Web App Setup, Login, Facebook Login, Registration, User Profile Implementation

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, CSS, HTML5, REST, SQL Server
Dates: Nov 1 – 9, 2016
Prize: $600

Living Progress - Build - Mentor ME - Services Implementation 2

Technologies: JPA, Java, MySQL, REST
Dates: Nov 1 – 7, 2016
Prize: $600

Living Progress - Build - Mentor ME - Services Implementation 3

Technologies: JPA, Java, MySQL, REST
Dates: Nov 1 – 6, 2016
Prize: $600

John Hancock - Project Coeus Admin Backend Assembly

Technologies: .NET, ASP.NET, Active Directory, C#, REST, SQL Server
Dates: Oct 29 – Nov 5, 2016
Prize: $600

48h Analytics Web App Prototype 3 Integration

Technologies: Bootstrap, CSS, HTML5, JavaScript, jQuery
Dates: Nov 2 – 4, 2016
Prize: $600

48h Analytics Web App Prototype 2 Integration

Technologies: Bootstrap, CSS, HTML5, JavaScript, jQuery
Dates: Nov 2 – 4, 2016
Prize: $600

Scout - Website d3.js Charts and Prototype Integration

Technologies: HTML, JavaScript
Dates: Oct 27 – Nov 2, 2016
Prize: $600

Living Progress - Build - Mentor ME - Services Implementation 1

Technologies: JPA, Java, MySQL, REST
Dates: Oct 21 – 28, 2016
Prize: $600

Analytics Web App d3js Chart Components 4

Technologies: HTML, JavaScript
Dates: Oct 22 – 27, 2016
Prize: $600

Analytics Web App Prototype 3

Technologies: Bootstrap, CSS, HTML5, JQuery, JavaScript
Dates: Oct 22 – 27, 2016
Prize: $600

Analytics Web App d3js Chart Components 3

Technologies: HTML, JavaScript
Dates: Oct 20 – 25, 2016
Prize: $600

Analytics Web App d3js Chart Components 2

Technologies: HTML, JavaScript
Dates: Oct 20 – 25, 2016
Prize: $600

96h! Analytics Web App Prototype 2

Technologies: Bootstrap, CSS, HTML5, JavaScript, jQuery
Dates: Oct 20 – 24, 2016
Prize: $600

72h!! John Hancock - Project Coeus Admin Features Architecture

Technologies: .NET, Active Directory, Angular.js (1.0), C#, IIS, REST, SQL Server
Dates: Oct 18 – 22, 2016
Prize: $600

72h! John Hancock - Project Coeus Users and Roles Management

Technologies: .NET, Active Directory, Angular.js (1.0), C#, JavaScript, REST, SQL Server
Dates: Oct 19 – 22, 2016
Prize: $600

Analytics Web App d3js Chart Components 1

Technologies: HTML, JavaScript
Dates: Oct 6 – 11, 2016
Prize: $600

Analytics Web App Prototype 1

Technologies: Bootstrap, CSS, HTML5, JQuery, JavaScript
Dates: Oct 6 – 11, 2016
Prize: $600

Admin App - Manage Copilots / Admins / Reviewers

Technologies: Angular.js (1.0), JavaScript, Node.js, REST
Dates: Oct 5 – 9, 2016
Prize: $600

USA Diving Team iOS iPad App - Bug Fixes Assembly

Technologies: Node.js, PostgreSQL, REST, Swift, Xcode, iOS
Dates: Sep 27 – Oct 2, 2016
Prize: $600

Living Progress - Build - Mentor Me - Data and Services Definition Architecture

Technologies: Android, Java, MySQL, REST
Dates: Sep 21 – 29, 2016
Prize: $600

Fujitsu - Cloud Service K5 Management Console UI Prototype

Technologies: Bootstrap, CSS, HTML5, JavaScript, ReactJS
Dates: Sep 23 – 28, 2016
Prize: $600

Praxair eMoc 1.1 Challenge 3

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Sep 20 – 25, 2016
Prize: $600

John Hancock - Project Argos Users and Roles Management

Technologies: .NET, Active Directory, Angular.js (1.0), C#, HTML, REST, SQL Server
Dates: Sep 16 – 21, 2016
Prize: $600

Admin App - TC API Reviewer Management API

Technologies: Java, Node.js, REST, SQL
Dates: Sep 16 – 21, 2016
Prize: $600

On Wheels - User Accounts API

Technologies: CSS, HTML5, JavaScript, Node.js
Dates: Sep 9 – 17, 2016
Prize: $600

Admin App - Manage Copilots / Admins / Reviewers

Technologies: Angular.js (1.0), Java, JavaScript, Node.js, SQL
Dates: Sep 7 – 12, 2016
Prize: $600

Fujitsu - Augmented Reality Application High Level API Development. Part 1 (Refactoring)

Technologies: JavaScript
Dates: Sep 6 – 11, 2016
Prize: $600

TCO - System Conversion File Processing

Technologies: Java
Dates: Sep 1 – 5, 2016
Prize: $600

USA Diving Team iOS iPad App - Bug Hunt

Technologies: iOS
Dates: Aug 31 – Sep 3, 2016
Prize: $600

Topcoder - Project Service Performance Testing

Technologies: JavaScript, Node.js, REST
Dates: Aug 28 – Sep 2, 2016
Prize: $600

Styx Certificate Manager Architecture

Technologies: .NET, C#, Windows Server
Dates: Aug 18 – 25, 2016
Prize: $600

96h Web Scraping Account Service API

Technologies: Node.js, REST
Dates: Aug 19 – 23, 2016
Prize: $600

TCO - 48h Web Scraping Error Service API

Technologies: Node.js, REST
Dates: Aug 19 – 21, 2016
Prize: $600

TCO - Augmented Reality Application Architecture

Technologies: HTML5, JavaScript
Dates: Aug 10 – 20, 2016
Prize: $600

USA Diving Team iOS iPad App Enhancements Assembly

Technologies: Node.js, PostgreSQL, REST, Swift, Xcode, iOS
Dates: Aug 10 – 15, 2016
Prize: $600

Topcoder - Bug Fixes and Enhancements to Project Service

Technologies: Node.js
Dates: Aug 5 – 9, 2016
Prize: $600

Admin Tool - Messages and Search Enhancements

Technologies: Angular.js (1.0), Elasticsearch, HTML, JavaScript, Node.js
Dates: Aug 2 – 6, 2016
Prize: $600

Praxair eMoc 1.1 Challenge 2

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Jul 25 – 31, 2016
Prize: $600

24h Rental Document Recall Android App

Technologies: Android, CSS, HTML5, JavaScript
Dates: Jul 23 – 24, 2016
Prize: $600

TCO - Financial Analysis REST API

Technologies: ASP.NET, C#, REST, SQL Server
Dates: Jul 15 – 19, 2016
Prize: $600

TCO - Styx Dashboard 1.2 - Defects Challenge 2

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, SQL Server
Dates: Jul 14 – 19, 2016
Prize: $600

TCO - Living Progress - Crowd Analytics - Haven OnDemand Data Visualization Enhancements

Technologies: JSON, JavaScript, Node.js
Dates: Jul 10 – 15, 2016
Prize: $600

Styx Dashboard 1.2 - Defects Challenge 1

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, SQL Server
Dates: Jul 7 – 12, 2016
Prize: $600

TCO - Living Progress - Data to Drops - Multiclass Learning and Classification

Technologies: Data Science, Python
Dates: Jul 4 – 11, 2016
Prize: $600

Living Progress - Crowd Analytics - Haven OnDemand Data Visualization

Technologies: JSON, JavaScript, Node.js
Dates: Jun 29 – Jul 5, 2016
Prize: $600

Living Progress - World Wildlife Fund - Trading Data Comparison Web Application

Technologies: ASP.NET, C#, JavaScript, Vertica
Dates: Jun 24 – Jul 4, 2016
Prize: $600

96h TC Tasks - Challenge Service Updates

Technologies: Node.js
Dates: Jun 28 – Jul 2, 2016
Prize: $600

TC Tasks - RabbitMQ Event Producer and Consumer

Technologies: Java
Dates: Jun 25 – 30, 2016
Prize: $600

John Hancock - Project SIM Web Bug Fixes

Technologies: .NET, Angular.js (1.0), C#, CSS, HTML5, JavaScript, REST, SQL Server
Dates: Jun 23 – 29, 2016
Prize: $600

John Hancock - Project SIM Mobile Bug Fixes

Technologies: Android, Angular.js (1.0), C#, CSS, JavaScript, REST, iOS
Dates: Jun 22 – 27, 2016
Prize: $600

John Hancock - Project Coeus Release Assembly

Technologies: .NET, Angular.js (1.0), C#, CSS, HTML5, JavaScript, REST, SQL Server
Dates: Jun 22 – 27, 2016
Prize: $600

Living Progress - Data to Drops - Python Learning and Classification

Technologies: Data Science, Python
Dates: Jun 15 – 23, 2016
Prize: $600

96h Admin Tool - Work Pages Enhancements

Technologies: Angular.js (1.0), Elasticsearch, HTML, Node.js
Dates: Jun 17 – 21, 2016
Prize: $600

Living Progress - CrowdAnalytics - Python Classification Challenge

Technologies: Data Science, JSON, Python, REST
Dates: Jun 11 – 19, 2016
Prize: $600

John Hancock - Project SIM Mobile Bug Hunt - Android

Technologies: Android
Dates: Jun 15 – 16, 2016
Prize: $600

John Hancock - Project SIM Mobile Bug Hunt - iOS

Technologies: iOS
Dates: Jun 15 – 16, 2016
Prize: $600

John Hancock - Project Coeus Bug Hunt

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, REST, SQL Server
Dates: Jun 15 – 16, 2016
Prize: $600

Status Reporting Tool Release Assembly

Technologies: .NET, Angular.js (1.0), C#, HTML, JavaScript, REST, SQL Server
Dates: Jun 10 – 16, 2016
Prize: $600

Praxair eMoc 1.1 Challenge 1

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Jun 9 – 14, 2016
Prize: $600

96h Web Traffic Filter Challenge

Technologies: Python
Dates: Jun 3 – 8, 2016
Prize: $600

96h Admin Tool - Project Listing Page

Technologies: Angular.js (1.0), Elasticsearch, HTML, Node.js
Dates: May 31 – Jun 4, 2016
Prize: $600

Status Reporting Tool Bug Hunt

Technologies: ASP.NET, Angular.js (1.0), C#, SQL Server
Dates: Jun 1 – 3, 2016
Prize: $600

72h IBM NPS - Wrap d3js Charts into React Components

Technologies: HTML, JavaScript, ReactJS
Dates: May 27 – 31, 2016
Prize: $600

Living Progress - Data to Drops - Keyword Categorization

Technologies: Data Science, Python
Dates: May 26 – 31, 2016
Prize: $600

Living Progress - CrowdAnalytics - Python Test Harness

Technologies: JSON, Python, REST
Dates: May 26 – 31, 2016
Prize: $600

Living Progress - CrowdAnalytics - Haven OnDemand Prototype

Technologies: Data Science, HPE Haven OnDemand, JSON, Python, REST
Dates: May 26 – 31, 2016
Prize: $600

John Hancock - Project Coeus Front End Assembly 2

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, HTML, REST, SQL Server
Dates: May 25 – 30, 2016
Prize: $600

John Hancock - Project SIM Web Bug Hunt - Admin

Technologies: .NET, Angular.js (1.0), C#, SQL Server
Dates: May 24 – 26, 2016
Prize: $600

96h Admin Tool - Tags Admin Challenge

Technologies: Angular.js (1.0), HTML, Node.js
Dates: May 22 – 26, 2016
Prize: $600

48h IBM NPS - d3js Chart 3

Technologies: HTML, JavaScript
Dates: May 23 – 25, 2016
Prize: $600

48h IBM NPS - d3js Chart 2

Technologies: HTML, JavaScript
Dates: May 23 – 25, 2016
Prize: $600

Man-in-the-middle proxy server

Technologies: Python
Dates: May 19 – 25, 2016
Prize: $600

John Hancock - Database Replacement Bug Hunt

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, SQL Server
Dates: May 19 – 23, 2016
Prize: $600

John Hancock - Project SIM Mobile Frontend Integration

Technologies: Android, C#, CSS, HTML5, JavaScript, REST, iOS
Dates: May 17 – 22, 2016
Prize: $600

72h IBM NPS - d3js Chart 1

Technologies: HTML, JavaScript
Dates: May 18 – 21, 2016
Prize: $600

SoftBank - Blockchain Based Donation Service Page Updates Assembly

Technologies: MongoDB, Node.js
Dates: May 12 – 17, 2016
Prize: $600

John Hancock - Project Coeus Front End Assembly 1

Technologies: .NET, Angular.js (1.0), C#, HTML, REST, SQL Server
Dates: May 9 – 16, 2016
Prize: $600

IBM NPS - Response REST API

Technologies: Node.js, REST
Dates: May 11 – 15, 2016
Prize: $600

John Hancock - Forecaster Release Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, REST, SQL Server
Dates: May 6 – 11, 2016
Prize: $600

72h Admin Tool - Work Items Integration

Technologies: Angular.js (1.0), HTML5, Node.js
Dates: May 6 – 9, 2016
Prize: $600

Topcoder FIT App Integration

Technologies: Android, Angular.js (1.0), MongoDB, Node.js, REST, iOS
Dates: Apr 30 – May 6, 2016
Prize: $600

96h Admin Tool - Mock API

Technologies: Angular.js (1.0), HTML5, Node.js
Dates: Apr 29 – May 3, 2016
Prize: $600

John Hancock - Project SIM Admin Web Frontend Integration

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, CSS, HTML5, JavaScript, REST
Dates: Apr 26 – May 3, 2016
Prize: $600

John Hancock - Project Coeus Backend Services Assembly

Technologies: .NET, C#, REST, SQL Server
Dates: Apr 27 – May 3, 2016
Prize: $600

Resource Forecasting Tool Bug Hunt

Technologies: .NET, Angular.js (1.0), C#, CSS, HTML5, SQL Server
Dates: Apr 27 – 29, 2016
Prize: $600

TVI One Stop App - iPad Prototype

Technologies: Swift, Xcode, iOS
Dates: Apr 23 – 28, 2016
Prize: $600

Styx Dashboard 1.1 - Defect Fixes Assembly 5

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, SQL
Dates: Apr 19 – 27, 2016
Prize: $600

96h Topcoder FIT App REST API

Technologies: MongoDB, Node.js
Dates: Apr 23 – 27, 2016
Prize: $600

John Hancock - Project Argos Frontend Integration Assembly

Technologies: .NET, Angular.js (1.0), C#, HTML, JavaScript, REST, SQL
Dates: Apr 21 – 27, 2016
Prize: $600

Topcoder FIT App UI Prototype

Technologies: Angular.js (1.0), CSS, HTML5
Dates: Apr 20 – 25, 2016
Prize: $600

TC kafka consumer to assign iOS badges

Technologies: Java, SQL
Dates: Apr 19 – 24, 2016
Prize: $600

Styx Dashboard 1.1 - Defect Fixes Assembly 4

Technologies: .NET, ASP.NET, Angular.js (1.0), C#
Dates: Apr 15 – 22, 2016
Prize: $600

Styx Dashboard 1.1 - Defect Fixes Assembly 3

Technologies: .NET, ASP.NET, Angular.js (1.0), C#
Dates: Apr 15 – 21, 2016
Prize: $600

John Hancock - Project SIM Backend REST API Assembly

Technologies: .NET, C#, REST, SQL
Dates: Apr 12 – 19, 2016
Prize: $600

UI Flow Editor - Inline Editing

Technologies: Angular.js (1.0), JavaScript
Dates: Apr 11 – 15, 2016
Prize: $600

TCS Loader - iOS Badges Load

Technologies: Java, SQL
Dates: Apr 8 – 15, 2016
Prize: $600

John Hancock - Project Coeus Module Architecture

Technologies: .NET, Angular.js (1.0), C#, IIS, REST, SQL Server
Dates: Apr 7 – 14, 2016
Prize: $600

IBM Castle - [24 hours] Domino Adapter Swagger Doc

Technologies: Java, REST
Dates: Apr 13 – 14, 2016
Prize: $600

[Bug Bounty] - Lightspeed PAY PER BUG FIX Challenge #1

Technologies: Angular.js (1.0), Java, JavaScript, PostgreSQL
Dates: Mar 25 – Apr 12, 2016
Prize: $600

Whack A Mole Mobile Game Bug Hunt

Technologies: Android, iOS
Dates: Apr 9 – 11, 2016
Prize: $600

John Hancock - Project SIM Backend Services Assembly

Technologies: .NET, C#, REST, SQL
Dates: Apr 1 – 7, 2016
Prize: $600

USA Diving Team iOS iPad App Graphs Assembly 2

Technologies: Node.js, PostgreSQL, REST, Swift, Xcode, iOS
Dates: Apr 1 – 6, 2016
Prize: $600

John Hancock - Project Argos Backend Services Assembly

Technologies: .NET, C#, REST, SQL
Dates: Apr 1 – 6, 2016
Prize: $600

TVI One Stop App - iPhone Prototype

Technologies: Swift, Xcode, iOS
Dates: Apr 1 – 6, 2016
Prize: $600

24h IBM - Whack A Mole Mobile Game

Technologies: Android, HTML5, JavaScript, iOS
Dates: Apr 5 – 6, 2016
Prize: $600

Online Car Shopping Android Mobile App Prototype

Technologies: Android, Java
Dates: Mar 28 – Apr 3, 2016
Prize: $600

Angular Directive - Screen Selector UI

Technologies: Angular.js (1.0), JavaScript
Dates: Mar 29 – Apr 3, 2016
Prize: $600

IBM - Whack A Mole Mobile Game Prototype

Technologies: Angular.js (1.0), CSS, HTML5
Dates: Mar 28 – 31, 2016
Prize: $600

IBM Castle - UI Plugins PoC

Technologies: Angular.js (1.0), CSS, JavaScript
Dates: Mar 25 – 28, 2016
Prize: $600

IBM - YouMix Front End Integration 2

Technologies: HTML5, JavaScript, Node.js
Dates: Mar 23 – 28, 2016
Prize: $600

Styx Dashboard 1.1 - Alarm Threshold Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, SQL
Dates: Mar 21 – 26, 2016
Prize: $600

Lightspeed Expanded View / Announcement / DoB Comment Bug Hunt

Technologies: Angular.js (1.0), Java, JavaScript, PostgreSQL
Dates: Mar 23 – 25, 2016
Prize: $600

FCBH internet.org Mobile Assembly

Technologies: Ruby, Ruby on Rails
Dates: Mar 18 – 24, 2016
Prize: $600

SoftBank - Node.js Replace Mongodb implementation with Blockchain

Technologies: MongoDB, Node.js
Dates: Mar 18 – 23, 2016
Prize: $600

John Hancock - Database Replacement Frontend Assembly 2

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, SQL Server
Dates: Mar 18 – 23, 2016
Prize: $600

IBM Castle - 96h Strongloop File Preview Service API

Technologies: Node.js
Dates: Mar 17 – 21, 2016
Prize: $600

IBM Castle - 96h Strongloop Timezone Service API

Technologies: Node.js
Dates: Mar 17 – 21, 2016
Prize: $600

IBM Castle - 48h Strongloop Machine Translation Service API

Technologies: Node.js
Dates: Mar 17 – 19, 2016
Prize: $600

John Hancock - Project Argos Architecture

Technologies: .NET, Angular.js (1.0), C#, IIS, REST, SQL
Dates: Mar 12 – 18, 2016
Prize: $600

John Hancock - Project SIM Ionic Video & Audio Build

Technologies: Android, Angular.js (1.0), iOS
Dates: Mar 12 – 15, 2016
Prize: $600

Signature Database Replacement Frontend Assembly 1

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, REST, SQL Server
Dates: Mar 4 – 13, 2016
Prize: $600

IBM Castle - 48h Timezone Service Ideation

Technologies: Node.js, REST
Dates: Mar 10 – 12, 2016
Prize: $600

SIM Module Architecture

Technologies: .NET, Android, Angular.js (1.0), C#, IIS, REST, SQL, iOS
Dates: Mar 5 – 11, 2016
Prize: $600

IBM - DES Web Specialists Front End Integration 2

Technologies: HTML5, JavaScript, Node.js, REST
Dates: Mar 4 – 10, 2016
Prize: $600

IBM Castle - Email Sample Data Generator

Technologies: Node.js, Python, Ruby
Dates: Mar 4 – 9, 2016
Prize: $600

IBM - Customer Spotlight Front End Integration

Technologies: Android, Node.js, iOS
Dates: Mar 3 – 8, 2016
Prize: $600

!96h - Styx Dashboard 1.1 - Threshold / SMTP / User Profile Integration Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, SQL
Dates: Mar 4 – 8, 2016
Prize: $600

Styx Dashboard 1.1 - Nginx Conversion

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, SQL
Dates: Mar 3 – 8, 2016
Prize: $600

SoftBank - Node.js Assembly Challenge 2 for Blockchain Based Service Prototype

Technologies: JavaScript, MongoDB, Node.js
Dates: Feb 29 – Mar 5, 2016
Prize: $600

Styx Dashboard 1.1 - Defect Fixes Assembly 2

Technologies: .NET, ASP.NET, C#
Dates: Feb 26 – Mar 5, 2016
Prize: $600

Styx Dashboard 1.1 - Defect Fixes Assembly 1

Technologies: .NET, ASP.NET, C#
Dates: Feb 25 – Mar 2, 2016
Prize: $600

SoftBank - Node.js Assembly Challenge 1 for Blockchain Based Service Prototype

Technologies: JavaScript, Node.js
Dates: Feb 10 – 17, 2016
Prize: $600

!!72h - USA Diving Team iOS iPad App Graphs Assembly

Technologies: Node.js, PostgreSQL, REST, Swift, Xcode, iOS
Dates: Feb 14 – 17, 2016
Prize: $600

Styx Dashboard 1.1 - Notifications Part 2 Assembly

Technologies: .NET, ASP.NET, C#
Dates: Feb 9 – 16, 2016
Prize: $600

Styx Dashboard 1.1 - Threshold / SMTP / User Profile UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Feb 10 – 15, 2016
Prize: $600

IBM - Quick Quack Integration Assembly

Technologies: Angular.js (1.0), Node.js
Dates: Feb 8 – 13, 2016
Prize: $600

TopCoder App Bug Dash 0216 - PAY PER BUG FIX

Technologies: Angular.js (1.0), Node.js
Dates: Jan 31 – Feb 13, 2016
Prize: $600

!!72h - Lightspeed Expanded View / Announcement / DoB Comment Assembly

Technologies: Angular.js (1.0), Java, PostgreSQL
Dates: Feb 2 – 5, 2016
Prize: $600

!!72h - Auto CMO Excel Tool Replacement Release Assembly

Technologies: HTML, Java
Dates: Feb 2 – 5, 2016
Prize: $600

USA Diving Team iOS iPad App Integration Assembly

Technologies: Node.js, PostgreSQL, REST, Swift, Xcode, iOS
Dates: Jan 27 – Feb 3, 2016
Prize: $600

Lightspeed Misc Enhancements Bug Hunt

Technologies: Angular.js (1.0), Java, JavaScript, PostgreSQL
Dates: Jan 31 – Feb 2, 2016
Prize: $600

Auto CMO Excel Tool Replacement Bug Hunt

Technologies: HTML, Java
Dates: Jan 28 – 30, 2016
Prize: $600

IBM - Cognitive Catalyst Portal Backend Services

Technologies: MongoDB, Node.js
Dates: Jan 22 – 27, 2016
Prize: $600

TopCoder Admin Tool - Submissions Management

Technologies: Angular.js (1.0), REST
Dates: Jan 20 – 27, 2016
Prize: $600

Rehrig Pacific Android Prototype App Assembly

Technologies: Android, Java, REST
Dates: Jan 21 – 26, 2016
Prize: $600

Rehrig Pacific iOS Prototype App Assembly

Technologies: REST, Swift, Xcode, iOS
Dates: Jan 21 – 26, 2016
Prize: $600

Styx Dashboard 1.1 - Threshold Part 2 Assembly

Technologies: .NET, ASP.NET, C#
Dates: Jan 21 – 26, 2016
Prize: $600

Styx Dashboard 1.1 - Notifications Part 1 Assembly

Technologies: .NET, ASP.NET, C#
Dates: Jan 20 – 25, 2016
Prize: $600

!!72hrs - Lightspeed Misc Enhancements Assembly

Technologies: Angular.js (1.0), Java, JavaScript, PostgreSQL
Dates: Jan 20 – 23, 2016
Prize: $600

Lightspeed Permission / Tagging / Collaboration Bug Hunt

Technologies: Angular.js (1.0), Java, JavaScript, PostgreSQL
Dates: Jan 21 – 23, 2016
Prize: $600

IBM - DES Web Specialists Front End Integration 1

Technologies: Node.js, REST
Dates: Jan 16 – 22, 2016
Prize: $600

IBM - YouMix Front End Integration 1

Technologies: Node.js
Dates: Jan 16 – 22, 2016
Prize: $600

!!96h IBM - Quick Quack Back-end Services

Technologies: Node.js
Dates: Jan 16 – 20, 2016
Prize: $600

USA Diving Team iOS iPad App - Backend Assemlby

Technologies: Node.js, PostgreSQL, REST
Dates: Jan 14 – 19, 2016
Prize: $600

Auto CMO Excel Tool Replacement Frontend Assembly

Technologies: HTML, Java
Dates: Jan 13 – 18, 2016
Prize: $600

Lightspeed Collaboration Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, PostgreSQL
Dates: Jan 12 – 17, 2016
Prize: $600

USA Diving Team iOS iPad App UI Assembly

Technologies: Swift, Xcode, iOS
Dates: Jan 9 – 14, 2016
Prize: $600

Auto CMO Excel Tool Replacement Backend Assembly

Technologies: HTML, Java
Dates: Dec 31, 2015 – Jan 6, 2016
Prize: $600

!!24h - Lightspeed Search and Filter Bug Hunt

Technologies: Angular.js (1.0), HTML5, Java, JavaScript
Dates: Jan 5 – 6, 2016
Prize: $600

Styx Dashboard 1.1 - Threshold Part 1 Assembly

Technologies: .NET, ASP.NET, C#
Dates: Dec 28, 2015 – Jan 4, 2016
Prize: $600

!!24h - Lightspeed Project Forecasting Bug Hunt

Technologies: Angular.js (1.0), HTML5, Java, PostgreSQL
Dates: Jan 3 – 4, 2016
Prize: $600

Lightspeed Admin / Notes / Edits Bug hunt

Technologies: Angular.js (1.0), HTML5, Java, PostgreSQL
Dates: Jan 1 – 3, 2016
Prize: $600

!!96h - Lightspeed Stress Test Assembly

Technologies: Angular.js (1.0), Java, PostgreSQL
Dates: Dec 30, 2015 – Jan 3, 2016
Prize: $600

IBM - SiBM Cognitive Catalyst Portal Architecture Challenge

Technologies: HTML5, IBM DB2, JavaScript, MongoDB, Node.js, PostgreSQL
Dates: Dec 24, 2015 – Jan 1, 2016
Prize: $600

!!96h - Lightspeed Search Enhancements Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, PostgreSQL
Dates: Dec 23 – 30, 2015
Prize: $600

Location Based Analytics Visualization Bug Fixes Assembly

Technologies: Angular.js (1.0), Java, REST, Spring
Dates: Dec 22 – 28, 2015
Prize: $600

eMoC Bug Fixes Assembly

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Dec 23 – 28, 2015
Prize: $600

!!72h - Lightspeed Project Forecasting Tab Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, PostgreSQL
Dates: Dec 23 – 26, 2015
Prize: $600

IBM - SiBM DES Web Specialists Back-end Services

Technologies: Node.js, REST
Dates: Dec 15 – 21, 2015
Prize: $600

Funktional Tracker Bug Fixes Assembly

Technologies: Java, MySQL
Dates: Dec 15 – 20, 2015
Prize: $600

Auto CMO Excel Tool Replacement Module Architecture

Technologies: HTML, Java, JavaScript, Oracle 10g
Dates: Dec 8 – 13, 2015
Prize: $600

Location Based Analytics Visualization Bug Hunt

Technologies: Angular.js (1.0), Java, JavaScript, REST, Spring
Dates: Dec 10 – 12, 2015
Prize: $600

USA Diving Team iOS iPad App - Prototype Part 1 [Swiftoberfest] [Swift/iOS Ready]

Technologies: Swift, Xcode, iOS
Dates: Dec 5 – 10, 2015
Prize: $600

!!72hrs IBM - SiBM Customer Spotlight Back-end Services

Technologies: Node.js
Dates: Dec 7 – 10, 2015
Prize: $600

Topcoder iOS App v1 Bug Hunt [Swiftoberfest]

Technologies: REST, Swift, iOS
Dates: Dec 7 – 9, 2015
Prize: $600

eMoC Admin Bug Fixes Assembly

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Dec 2 – 8, 2015
Prize: $600

IBM - SiBM YouMix Back-end Services

Technologies: Node.js
Dates: Nov 23 – 30, 2015
Prize: $600

Topcoder iOS App v1 [Swiftoberfest] [Swift/iOS Ready]

Technologies: REST, Swift, Xcode, iOS
Dates: Nov 23 – 28, 2015
Prize: $600

LightSpeed Notes and MSR View Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, PostgreSQL
Dates: Nov 15 – 20, 2015
Prize: $600

IBM SiBM - ClipStreamer Web Integration Assembly

Technologies: CSS, HTML5, JavaScript, REST
Dates: Nov 10 – 15, 2015
Prize: $600

[BONUS!!!] Location Based Analytics Visualization Frontend Assembly

Technologies: Angular.js (1.0), Java, JavaScript, REST, Spring
Dates: Nov 10 – 15, 2015
Prize: $600

SiBM - IBM Enterprise Social Network Integration 1

Technologies: CSS, HTML, JSON, JavaScript, Node.js, REST
Dates: Nov 5 – 10, 2015
Prize: $600

LightSpeed MVP UI Prototype Updates

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Oct 30 – Nov 4, 2015
Prize: $600

Topcoder iOS App Prototype Assembly [Swiftoberfest] [Swift/iOS Ready]

Technologies: Swift, Xcode, iOS
Dates: Oct 29 – Nov 3, 2015
Prize: $600

TC Community Site Bug Hunt

Technologies: HTML, JavaScript
Dates: Oct 30 – Nov 2, 2015
Prize: $600

Platane Bug Hunt

Technologies: Angular.js (1.0), HTML5, Java, Oracle 10g
Dates: Oct 29 – 31, 2015
Prize: $600

Location Based Analytics Visualization Backend Assembly

Technologies: Angular.js (1.0), Hibernate, Java, REST, Spring
Dates: Oct 14 – 20, 2015
Prize: $600

IBM SiBM Agile Standup Web Socket Integration Assembly

Technologies: Android, JavaScript, MongoDB, Node.js, PhoneGap, iOS
Dates: Oct 13 – 19, 2015
Prize: $600

Platane Frontend Integration 2

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, REST, Spring
Dates: Oct 6 – 11, 2015
Prize: $600

Location Based Analytics Visualization Responsive UI Prototype Part 2

Technologies: Angular.js (1.0), CSS, HTML5
Dates: Sep 30 – Oct 7, 2015
Prize: $600

IBM SiBM Agile Standup Integration Assembly

Technologies: Android, JavaScript, MongoDB, Node.js, PhoneGap, iOS
Dates: Sep 29 – Oct 6, 2015
Prize: $600

IBM SiBM - ClipStreamer REST API

Technologies: Node.js, REST
Dates: Sep 30 – Oct 6, 2015
Prize: $600

IBM SiBM - ClipStreamer Mobile Share POC

Technologies: Android, PhoneGap, iOS
Dates: Sep 28 – Oct 3, 2015
Prize: $600

LightSpeed MVP UI Prototype

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Sep 23 – Oct 1, 2015
Prize: $600

IBM SiBM - ClipStreamer Browser Bookmarklet POC

Technologies: JavaScript
Dates: Sep 25 – 28, 2015
Prize: $600

SRT 1.2 Functional Bug Hunt

Technologies: Angular.js (1.0), HTML5, Java, JavaScript
Dates: Sep 22 – 25, 2015
Prize: $600

IBM - SiBM IBM(at)HD Front End Integration

Technologies: Android, JavaScript, Node.js, REST, iOS
Dates: Sep 19 – 24, 2015
Prize: $600

SRT v1.2 Stress Test Suite

Technologies: Angular.js (1.0), HTML5, Java, Oracle 10g, PostgreSQL
Dates: Sep 16 – 22, 2015
Prize: $600

IBM SiBM Agile Stand-up Back-end Services

Technologies: MongoDB, Node.js
Dates: Sep 15 – 21, 2015
Prize: $600

SRT 1.2 Content Updatnes and Unified Tab Bug Hunt

Technologies: Angular.js (1.0), Java, JavaScript
Dates: Sep 17 – 19, 2015
Prize: $600

SRT 1.2 Collaboration Bug Hunt

Technologies: Angular.js (1.0), Java, JavaScript
Dates: Sep 15 – 17, 2015
Prize: $600

C# / .NET Web App - CPR Frontend Release Assembly

Technologies: .NET, ASP.NET, C#, SQL Server, Windows Communication Foundation
Dates: Sep 11 – 17, 2015
Prize: $600

SRT 1.2 Sync and Offline Bug Hunt

Technologies: Angular.js (1.0), HTML5, Java
Dates: Sep 15 – 17, 2015
Prize: $600

LightSpeed MVP Frontend Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, PostgreSQL
Dates: Sep 11 – 17, 2015
Prize: $600

Moneta - Mobile iOS Prototype App Assembly

Technologies: Swift, Xcode, iOS 8.0
Dates: Sep 10 – 15, 2015
Prize: $600

SRT HTML5 Unified Tab Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Sep 5 – 12, 2015
Prize: $600

SRT HTML5 Collaboration Assembly Part 2

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Sep 4 – 9, 2015
Prize: $600

IBM - SiBM IBM(at)HD Backend Service

Technologies: JavaScript, Node.js, REST
Dates: Sep 2 – 7, 2015
Prize: $600

IBM SiBM - ClipStreamer Architecture Challenge

Technologies: Android, HTML5, JavaScript, Node.js, REST, iOS
Dates: Sep 2 – 7, 2015
Prize: $600

SRT HTML5 Sync Performance Improvement Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, Oracle 10g, PostgreSQL
Dates: Sep 2 – 7, 2015
Prize: $600

eMoC Front End Advanced MOC Management Assembly

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Aug 30 – Sep 6, 2015
Prize: $600

C# / .NET Web App - CPR Frontend Bug Hunt

Technologies: ASP.NET, C#, SQL Server
Dates: Sep 1 – 5, 2015
Prize: $600

[CODEBLITZ] LightSpeed MVP Backend Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Hibernate, Java, PostgreSQL
Dates: Aug 29 – Sep 3, 2015
Prize: $600

HOME's O2O iOS Prototype App Assembly

Technologies: Swift, Xcode, iOS
Dates: Aug 29 – Sep 3, 2015
Prize: $600

[CODEBLITZ] SRT HTML5 Customer Bug Fixes Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, Oracle 10g, PostgreSQL
Dates: Aug 29 – Sep 3, 2015
Prize: $600

[CODEBLITZ] SRT HTML5 Collaboration Assembly Part 1

Technologies: Angular.js (1.0), CSS, HTML5, Java, Oracle 10g, PostgreSQL
Dates: Aug 22 – 28, 2015
Prize: $600

[CODEBLITZ] LightSpeed MVP PoC UI Prototype

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Aug 20 – 26, 2015
Prize: $600

[CODEBLITZ] SRT HTML5 Single War Bug Fixes Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, Oracle 10g, PostgreSQL
Dates: Aug 17 – 22, 2015
Prize: $600

Conference Room Web App Assembly

Technologies: .NET, C#, IIS, SQL Server, Windows Server
Dates: Aug 14 – 20, 2015
Prize: $600

Platane Frontend Integration 1

Technologies: Angular.js (1.0), HTML5, Java Application, JavaScript, Oracle 10g, REST, Spring
Dates: Aug 12 – 19, 2015
Prize: $600

eMoC Front End Basic MOC Management Assembly

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Aug 14 – 19, 2015
Prize: $600

Location Based Analytics Visualization Responsive UI Prototype Part 1

Technologies: Angular.js (1.0), CSS, HTML5
Dates: Aug 13 – 18, 2015
Prize: $600

CPR Bug Fixes Assembly

Technologies: .NET, ASP.NET, C#, SQL Server, Windows Communication Foundation, Windows Server
Dates: Aug 12 – 17, 2015
Prize: $600

SRT HTML5 Customer Function Bug Hunt

Technologies: Angular.js (1.0), HTML5
Dates: Aug 15 – 16, 2015
Prize: $600

SRT HTML5 Estimates / Staffing Fields Bug Hunt

Technologies: Angular.js (1.0), HTML5
Dates: Aug 15 – 16, 2015
Prize: $600

SRT HTML5 Single War Bug Hunt

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Aug 12 – 14, 2015
Prize: $600

[CODEBLITZ] SRT HTML5 Content Updates Assembly

Technologies: Angular.js (1.0), CSS, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Aug 5 – 11, 2015
Prize: $600

Location Based Analytics Visualization Module Architecture

Technologies: Angular.js (1.0), HTML5, Java, SQL, Spring
Dates: Aug 5 – 11, 2015
Prize: $600

Customer Web Portal - Admin Enhancement Assembly

Technologies: .NET, ASP.NET, C#
Dates: Jul 30 – Aug 5, 2015
Prize: $600

[CODE BLITZ] SRT HTML5 Bug Fixes Assembly 4 - Offline Mode

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jul 29 – Aug 3, 2015
Prize: $600

!!FAST 72h CPR JDE Sync Updates Assembly

Technologies: .NET, ASP.NET, C#, SQL Server, Windows Communication Foundation, Windows Server
Dates: Jul 24 – 29, 2015
Prize: $600

SRT HTML5 Offline Mode Bug Hunt

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript
Dates: Jul 25 – 27, 2015
Prize: $600

[CODE BLITZ] !!FAST 48h - SRT HTML5 Sync Assembly 07/24 r250308

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jul 24 – 26, 2015
Prize: $600

[CODE BLITZ] SRT HTML5 Bug Fixes Assembly 3

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jul 21 – 26, 2015
Prize: $600

5 Prizes!! Styx Dashboard Full 2.2 - .NET Comm Server Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#
Dates: Jul 17 – 22, 2015
Prize: $600

[CODE BLITZ] SRT HTML5 - Consulting Services Assembly

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript, Oracle 10g, PostgreSQL
Dates: Jul 15 – 21, 2015
Prize: $600

Platane Manager Services and REST API Assembly - Part 2

Technologies: Hibernate, JPA, Java, Oracle 10g, REST, Spring, Web Services
Dates: Jul 14 – 19, 2015
Prize: $600

[CODE BLITZ] !!FAST 60hrs - SRT HTML5 Sync Assembly 07/16 r250272

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jul 17 – 19, 2015
Prize: $600

SRT JSP and HTML5 r250197 Comparison Bug Hunt

Technologies: Angular.js (1.0), HTML5, Java, JavaScript
Dates: Jul 15 – 17, 2015
Prize: $600

[CODE BLITZ] !!FAST 60hrs - SRT HTML5 Bug Fix 208 and Sync Assembly 07/07 r250237

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jul 12 – 14, 2015
Prize: $600

PR Website UI Prototype

Technologies: HTML5, JavaScript
Dates: Jul 4 – 10, 2015
Prize: $600

C# / .NET Web App - eMoC Backend Advanced MOC Management Assembly

Technologies: ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Jun 29 – Jul 7, 2015
Prize: $600

[CODE BLITZ] !!FAST 72hrs - SRT HTML5 Sync Assembly 06/24 r250197

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jul 4 – 7, 2015
Prize: $600

5 Prizes!! Styx Dashboard Full 2.3 - Area Utilization .NET Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#
Dates: Jun 25 – Jul 4, 2015
Prize: $600

SRT HTML5 Bug Fixes Assembly 2

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jun 28 – Jul 3, 2015
Prize: $600

5 Prizes!! Styx Dashboard Full 2.1 - App Server Page .NET Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#
Dates: Jun 25 – Jul 2, 2015
Prize: $600

C# / .NET Web App - CPR Front End Product Assembly

Technologies: .NET, ASP.NET, C#, SQL Server, Windows Communication Foundation, Windows Server
Dates: Jun 24 – 29, 2015
Prize: $600

Platane Manager Services and REST API Assembly - Part 1

Technologies: Hibernate, JPA, Oracle 10g, REST, Spring, Web Services
Dates: Jun 22 – 28, 2015
Prize: $600

!!FAST 72hrs - SRT HTML5 Sync Assembly 06/17 r250167

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jun 25 – 28, 2015
Prize: $600

SRT HTML5 Avamar and NetWorker Content Updates Assembly

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript, Oracle 10g, PostgreSQL
Dates: Jun 15 – 21, 2015
Prize: $600

Funktional Tracker Credit Card Processing Assembly

Technologies: Java, MySQL
Dates: Jun 12 – 17, 2015
Prize: $600

SRT JSP and HTML5 r250068 Comparison Bug Hunt

Technologies: Angular.js (1.0), HTML5, JSP, Oracle 10g, PostgreSQL
Dates: Jun 14 – 16, 2015
Prize: $600

!!FAST 72hrs - SRT HTML5 Sync Assembly 06/10 r250114

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jun 13 – 16, 2015
Prize: $600

C# / .NET Web App - eMoC Backend Basic MOC Management Assembly

Technologies: ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: Jun 9 – 14, 2015
Prize: $600

!!FAST 72hrs - SRT HTML5 Sync Assembly 06/03 r250068

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jun 4 – 7, 2015
Prize: $600

Funktional Tracker Bug Fixes Release Assembly

Technologies: Java, MySQL
Dates: Jun 2 – 7, 2015
Prize: $600

C# / .NET Web App - CPR Front End Security Product List and Category Assembly

Technologies: .NET, ASP.NET, C#, SQL Server, Windows Communication Foundation, Windows Server
Dates: May 30 – Jun 4, 2015
Prize: $600

SRT HTML5 Bug Fixes Assembly 1

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript, Oracle 10g, PostgreSQL
Dates: May 30 – Jun 4, 2015
Prize: $600

Funktional Tracker Implement Avatars and Badge Assembly

Technologies: Java, MySQL
Dates: May 28 – Jun 3, 2015
Prize: $600

Platane Jira, AD and Exchange Server Connectors Assembly

Technologies: Hibernate, JPA, Oracle 10g, REST, Web Services
Dates: May 29 – Jun 3, 2015
Prize: $600

!!FAST 72hrs - SRT HTML5 Sync Assembly 05/26 r250009

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript, Oracle 10g, PostgreSQL
Dates: May 28 – 31, 2015
Prize: $600

Styx Dashboard Full #1.1 - Database Server Page Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, HTML5
Dates: May 20 – 29, 2015
Prize: $600

Customer Web Portal - Query Designer and Client Admin Assembly

Technologies: .NET, ASP.NET, C#
Dates: May 19 – 26, 2015
Prize: $600

TravelBuddy Mobile App - Replace Authentication with SSO (SAML + ADFS)

Technologies: Android, C#, IIS, PhoneGap, SQL Server, iOS
Dates: May 19 – 25, 2015
Prize: $600

C# / .NET Web App - eMoC Backend Basic infrastructure Assembly

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: May 20 – 25, 2015
Prize: $600

C# / .NET Web App - eMoC Frontend Architecture

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation
Dates: May 20 – 25, 2015
Prize: $600

Platane Database and Persistence Assembly

Technologies: Hibernate, Java, Oracle 10g
Dates: May 20 – 25, 2015
Prize: $600

!!FAST 72hrs - SRT HTML5 Sync Assembly 05/18 r249978

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript, Oracle 10g, PostgreSQL
Dates: May 21 – 24, 2015
Prize: $600

SRT JSP and HTML5 r249917 Comparison Bug Hunt

Technologies: Angular.js (1.0), HTML5, JSP, Oracle 10g, PostgreSQL
Dates: May 21 – 23, 2015
Prize: $600

C# / .NET Web App - CPR Backend Export, Import and JDE Sync Assembly

Technologies: .NET, C#, SQL Server, Windows Communication Foundation
Dates: May 8 – 14, 2015
Prize: $600

Travel Buddy Mobile/Web App - Release Assembly

Technologies: Android, C#, IIS, PhoneGap, SQL Server, iOS
Dates: May 7 – 12, 2015
Prize: $600

SRT HTML5 ET Production Fixes Part 2 Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Apr 30 – May 7, 2015
Prize: $600

Styx iOS Video Mobile App Enhancements Assembly

Technologies: Objective C, Xcode, iOS 8.0
Dates: Apr 25 – May 3, 2015
Prize: $600

CPR Web App UI Prototype

Technologies: CSS, HTML5, JavaScript
Dates: Apr 27 – May 2, 2015
Prize: $600
1st

Location Based Analytics Visualization Opportunity

Dates: Apr 28 – May 1, 2015
Prize: $150

eMOC App Desktop UI Prototype Challenge

Technologies: CSS, HTML5, JavaScript
Dates: Apr 23 – 29, 2015
Prize: $600

SRT - Find Missing Form Fields Bug Hunt

Technologies: JSP, Java, PostgreSQL
Dates: Apr 25 – 28, 2015
Prize: $600

C# / .NET Web App - eMoC Backend Architecture

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Communication Foundation, Windows Server
Dates: Apr 18 – 25, 2015
Prize: $600

C# / .NET Web App - CPR Backend Core Assembly

Technologies: .NET, C#, SQL Server, Windows Communication Foundation
Dates: Apr 15 – 21, 2015
Prize: $600

Java Service Failover - Enhancements Assembly

Technologies: HTTP, JUnit, Java
Dates: Apr 14 – 20, 2015
Prize: $600

C# / .NET Web App - CPR Frontend Architecture

Technologies: .NET, ASP.NET, C#, SQL Server, Windows Server
Dates: Apr 15 – 20, 2015
Prize: $600

SRT HTML5 ET Production Fixes Part 1 Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Apr 11 – 18, 2015
Prize: $600

!!FAST 72hrs - Swift iOS Facial Recognition App Integration Assembly

Technologies: Swift, Xcode, iOS 8.0
Dates: Apr 11 – 14, 2015
Prize: $600

!!FAST 48h - SRT HTML5 Merge 4 (all) Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Apr 3 – 5, 2015
Prize: $600

Swift iOS Facial Recognition App PoC Assembly

Technologies: Swift, Xcode, iOS 8.0
Dates: Mar 29 – Apr 3, 2015
Prize: $600

C# / .NET Web App - eMoC System Architecture

Technologies: .NET, ASP.NET, C#, REST, SQL Server, Windows Server
Dates: Mar 23 – 30, 2015
Prize: $600

SRT 1.1 PDF Generation Assembly

Technologies: HTML, JSP, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Mar 21 – 26, 2015
Prize: $600

Styx Dashboard Webapp IIS to nginX conversion Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), SQL Server, Windows Server
Dates: Mar 17 – 26, 2015
Prize: $600

Java Service Failover - Async HTTP(s) Connection Assembly

Technologies: HTTP, JUnit, Java
Dates: Mar 19 – 24, 2015
Prize: $600

!!FAST 72h SRT HTML5 Merge 3 (CTA+Atmos+ASD+VMWare+Xtreme) Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Mar 21 – 24, 2015
Prize: $600

!!FAST 24h - SISN App Bug Hunt

Technologies: Angular.js (1.0), HTML5
Dates: Mar 22 – 23, 2015
Prize: $600

C# / .NET Web App - CPR Backend Architecture

Technologies: .NET, C#, SQL Server, Windows Server
Dates: Mar 16 – 21, 2015
Prize: $600

SRT HTML5 Healthcheck and Isilon and ViPR Tabs (from Merge 2) Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Mar 15 – 20, 2015
Prize: $600

SRT HTML5 Residency and Vblock and Disk Retention Tabs (from Merge 2) Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Mar 13 – 18, 2015
Prize: $600

Healthcare Mobile iPhone App Using Swift Assembly

Technologies: Swift, Xcode, iOS
Dates: Mar 10 – 15, 2015
Prize: $600

Climate Resilience Data Permafrost iOS App UI Assembly 1

Technologies: Xcode, iOS 8.0
Dates: Mar 8 – 14, 2015
Prize: $600

SRT HTML5 VMWare and Xtreme Tabs (from Merge 1) Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Mar 8 – 13, 2015
Prize: $600

Operation NGINX - Support HTTPS Streams

Technologies: C, C++, HTML, HTTP, REST
Dates: Mar 6 – 11, 2015
Prize: $600

Lifelog iOS Mobile App using Swift UI Assembly 1 - realworldswift

Technologies: Swift, iOS
Dates: Mar 2 – 9, 2015
Prize: $600

SISN using AWS - Base Assembly

Technologies: Angular.js (1.0), HTML5, JavaScript
Dates: Mar 3 – 9, 2015
Prize: $600
1st

Central Product Repository Copilot Opportunity

Dates: Mar 4 – 7, 2015
Prize: $150
1st

Management of Change Copilot Opportunity

Dates: Mar 4 – 7, 2015
Prize: $150

SRT HTML5 CTA and Atmos and ASD Tabs (from Merge 1) Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Mar 2 – 7, 2015
Prize: $600
1st

Facial Recognition iOS app Copilot Opportunity

Dates: Mar 4 – 7, 2015
Prize: $150

!!FAST 72hrs - SRT HTML5 Merge 2 (DPAD+CS+Change Request+Source One) Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Mar 4 – 7, 2015
Prize: $600

Climate Resilience Data Tawa iOS App UI Assembly 1

Technologies: Xcode, iOS 8.0
Dates: Feb 28 – Mar 6, 2015
Prize: $600

Nairobi Mobile App (iOS) Assembly

Technologies: Xcode, iOS
Dates: Feb 26 – Mar 4, 2015
Prize: $600

Java Service Failover - HTTP(s) Connection Assembly

Technologies: HTTP, Java
Dates: Feb 25 – Mar 2, 2015
Prize: $600

Android Learning Game App Bug Hunt

Technologies: Android
Dates: Feb 19 – 21, 2015
Prize: $600

SRT 1.1 Approval Process Assembly

Technologies: HTML, JSP, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Feb 14 – 20, 2015
Prize: $600

SRT HTML5 CS Services and Change Request and Source One Tabs (from DPAD part 1) Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Feb 13 – 20, 2015
Prize: $600

SRT HTML 5 DPAD Part 2 Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Feb 11 – 18, 2015
Prize: $600

Operation NGINX - Safari Switches and Fixes

Technologies: C, C++, HTML, HTTP, REST
Dates: Feb 10 – 16, 2015
Prize: $600

48hrs FAST!! - SRT HTML5 Merge 1 (File+Mainframe+Replication+SRM+W4N) Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Feb 11 – 13, 2015
Prize: $600

[Bug Bounty] - TC Web Arena PAY PER BUG FIX Challenge 4

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Feb 3 – 12, 2015
Prize: $600

48hrs FAST!! - SRT 1.1 Approval Process UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Feb 9 – 11, 2015
Prize: $600

SRT 1.1 FEB 2015 Updates - Template Folder Assembly

Technologies: HTML, JSP, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Feb 6 – 11, 2015
Prize: $600

Operation NGINX - Enhanced Test Page

Technologies: C, C++, HTML, HTTP, REST
Dates: Jan 30 – Feb 6, 2015
Prize: $600

SRT HTML5 DPAD Part 1 Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jan 26 – 31, 2015
Prize: $600

SRT HTML5 Replication and SRM and W4N Tabs Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jan 25 – 30, 2015
Prize: $600

Operation NGINX - Transcode to Progressive-MP4 Assembly

Technologies: C, C++, HTTP, REST
Dates: Jan 25 – 30, 2015
Prize: $600

SRT HTML5 File and Mainframe Tabs Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jan 24 – 29, 2015
Prize: $600

Styx Dashboard Webapp Free Version UI Updates Bug Hunt

Technologies: ASP.NET, Angular.js (1.0), HTML5
Dates: Jan 25 – 27, 2015
Prize: $600

Styx Dashboard Webapp Switch to SQLite Database Assembly

Technologies: .NET, ASP.NET, SQL
Dates: Jan 20 – 25, 2015
Prize: $600

Customer Web Portal - Chain of Custody Record Assembly

Technologies: .NET, ASP.NET, C#
Dates: Jan 17 – 24, 2015
Prize: $600

Operation Nginx - Unit Tests

Technologies: C, C++, HTTP, REST
Dates: Jan 15 – 22, 2015
Prize: $600

Web Arena Keyboard shortcuts Assembly

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Jan 16 – 21, 2015
Prize: $600

Styx Dashboard Webapp Free Version UI Updates Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, HTML5
Dates: Jan 13 – 18, 2015
Prize: $600

Parse TE rules from text file code challenge

Technologies: Java, MySQL
Dates: Jan 8 – 12, 2015
Prize: $600

[Bug Bounty] - TC Web Arena PAY PER BUG FIX Challenge 3

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Dec 19, 2014 – Jan 11, 2015
Prize: $600

SRT HTML5 DEC 2014 Updates Assembly

Technologies: Angular.js (1.0), HTML5, Java, JavaScript, Oracle 10g, PostgreSQL
Dates: Jan 4 – 10, 2015
Prize: $600

Operation NGINX - File Clean Up

Technologies: C, C++, HTTP, REST
Dates: Jan 2 – 7, 2015
Prize: $600

Randivoo v2 iOS App UI Integration Assembly

Technologies: Objective C, PhoneGap, Salesforce, Xcode, iOS
Dates: Dec 31, 2014 – Jan 6, 2015
Prize: $600

Web Arena - Scrolling Issues Fixes Assembly

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Dec 25 – 30, 2014
Prize: $600

Espresso iOS App - Release Assembly

Technologies: Objective C, Xcode, iOS
Dates: Dec 24 – 29, 2014
Prize: $600

Web Arena - Leaderboard Performance Improvement

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Dec 19 – 24, 2014
Prize: $600

SRT HTML5 Prototype 9

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Dec 17 – 22, 2014
Prize: $600

SRT HTML5 Prototype 8

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Dec 17 – 22, 2014
Prize: $600

SRT HTML5 Prototype 7

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Dec 17 – 22, 2014
Prize: $600

Espresso iOS App - Bug Hunt

Technologies: Objective C, Xcode, iOS
Dates: Dec 20 – 22, 2014
Prize: $600

SRT HTML5 OCT 2014 Updates Assembly

Technologies: Angular.js (1.0), CSS, HTML5, Java, Oracle 10g
Dates: Dec 16 – 21, 2014
Prize: $600

FAST 72hrs!!! Web Arena Max Live Leaderboard Assembly

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Dec 16 – 19, 2014
Prize: $600

FAST 72hrs!!! Web Arena SRM Problem Deep Link Assembly

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Dec 16 – 19, 2014
Prize: $600

FAST! Operation NGINX- Pseudo-HLS tweaks.

Technologies: C
Dates: Dec 15 – 17, 2014
Prize: $600

SRT 1.1 DEC 2014 Risk Caluclation Assembly

Technologies: HTML, JSP, Java, JavaScript, Oracle 10g
Dates: Dec 11 – 17, 2014
Prize: $600

POP/IMAP Proxy Supporting SSL and OAuth Assembly

Technologies: Go
Dates: Dec 10 – 16, 2014
Prize: $600

FAST 72hrs!!! Web Arena - Performance issue replication in dev environment

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Dec 11 – 15, 2014
Prize: $600

FAST 72Hrs!!! Web Arena - Performance analysis and code review

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Dec 11 – 15, 2014
Prize: $600

Randivoo v2 iOS App Assembly

Technologies: Objective C, PhoneGap, Salesforce, Xcode, iOS
Dates: Dec 9 – 15, 2014
Prize: $600

SRT 1.1 DEC 2014 Updates Assembly

Technologies: HTML, JSP, Java, JavaScript, Oracle 10g
Dates: Dec 6 – 14, 2014
Prize: $600

SRT 1.1 UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Dec 5 – 10, 2014
Prize: $600

Transcoder Service- Operation NGINX- NGINX Module with libLVC Part 2!

Technologies: C, C++, HTTP
Dates: Dec 4 – 10, 2014
Prize: $600

Styx Dashboard Web Application Test Scenarios

Technologies: ASP.NET, Angular.js (1.0), HTML
Dates: Dec 4 – 10, 2014
Prize: $600

Espresso iOS App - Code Refactoring Assembly

Technologies: Objective C, Xcode, iOS
Dates: Dec 1 – 9, 2014
Prize: $600

Aegle - Medical Inquiries iPad App UI Assembly - realworldswift

Technologies: Swift, Xcode, iOS
Dates: Dec 3 – 8, 2014
Prize: $600

Web Arena Deep Link Assembly

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML5, JavaScript
Dates: Nov 26 – Dec 1, 2014
Prize: $600

SRT HTML5 SRT3 and Hybrid Path Assembly

Technologies: Angular.js (1.0), HTML5, Java, Oracle 10g
Dates: Nov 24 – 30, 2014
Prize: $600

SRT HTML5 Prototype 6

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Nov 25 – 30, 2014
Prize: $600

SRT HTML5 Prototype 5

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Nov 25 – 30, 2014
Prize: $600

SRT HTML5 Prototype 4

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Nov 25 – 30, 2014
Prize: $600

Web Arena Plugin API Part 2 Assembly

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML, JavaScript
Dates: Nov 24 – 29, 2014
Prize: $600

Event Check In iOS Apps PoC Assembly - realworldswift

Technologies: Swift, Xcode, iOS
Dates: Nov 24 – 29, 2014
Prize: $600

NthID iOS App Bug Fixes Assembly

Technologies: Objective C, Xcode, iOS
Dates: Nov 24 – 29, 2014
Prize: $600

SRT 4 OCT2014 Updates Part 2 Assembly

Technologies: HTML, JSP, Java, JavaScript, Oracle 10g
Dates: Nov 23 – 29, 2014
Prize: $600

Event Check In iPad App UI Assembly - realworldswift

Technologies: Swift, Xcode, iOS
Dates: Nov 23 – 28, 2014
Prize: $600

Mail Proxy OAuth support for GMail Assembly

Technologies: Go
Dates: Nov 21 – 27, 2014
Prize: $600

POP Proxy support all commands Assembly

Technologies: Go
Dates: Nov 18 – 25, 2014
Prize: $600

Styx App Server Metrics Collection Assembly

Technologies: .NET, C#, SQL
Dates: Nov 19 – 24, 2014
Prize: $600

Trancoder Service-Operation NGINX- NGINX Module with libLVC

Technologies: C, C++, HTTP
Dates: Nov 16 – 22, 2014
Prize: $600

Event Info Mobile App - realworldswift

Technologies: Swift, Xcode, iOS
Dates: Nov 12 – 17, 2014
Prize: $600

Espresso iOS App - Functional Updates Assembly

Technologies: Objective C, Xcode, iOS
Dates: Nov 11 – 16, 2014
Prize: $600

SRT 4 OCT2014 Updates Part 1 Assembly

Technologies: HTML, JSP, Java, JavaScript, Oracle 10g
Dates: Nov 10 – 15, 2014
Prize: $600

Styx Dashboard Webapp Free Version Assembly

Technologies: .NET, ASP.NET, Angular.js (1.0), C#, HTML5
Dates: Nov 8 – 15, 2014
Prize: $600

[Bug Bounty] - TC Web Arena PAY PER BUG FIX Challenge 2

Technologies: Angular.js (1.0), HTML, JavaScript, Node.js
Dates: Oct 21 – Nov 14, 2014
Prize: $600

FAST 72Hrs!! SRT 4 - Add RecoverPoint Section to DPAD UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Nov 10 – 13, 2014
Prize: $600

DTA OM Swap Interface- Java-based Mock Webservice on Heroku

Technologies: Java, Web Services
Dates: Nov 7 – 11, 2014
Prize: $600

SRT Phase 4 Add Postgres Support Assembly

Technologies: JSP, Java, Oracle 10g, PostgreSQL
Dates: Nov 5 – 10, 2014
Prize: $600

Styx Metrics and Dashboard Integration Assembly

Technologies: .NET, C#, Windows Server
Dates: Nov 4 – 10, 2014
Prize: $600

Web Arena Plugin API Part 1

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML, JavaScript
Dates: Nov 4 – 9, 2014
Prize: $600

Fast 72Hrs!! QMS UI Updates and Misc Bug Fixes

Technologies: HTML, JavaScript, Node.js
Dates: Nov 5 – 8, 2014
Prize: $600

96Hrs!! Ebola Symptom Tracker - realworldswift

Technologies: Swift, Xcode, iOS
Dates: Nov 4 – 8, 2014
Prize: $600

SRT 4 General Bug Hunt

Technologies: JSP, Java
Dates: Nov 5 – 7, 2014
Prize: $600

FAST 48Hrs!! QMS Fling Code Challenge-Node.js with websockets

Technologies: CSS, HTML, JavaScript, Node.js
Dates: Nov 4 – 6, 2014
Prize: $600

Quick 48Hrs!! Web Arena Member Feedback Widget Assembly

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML, JavaScript
Dates: Nov 4 – 6, 2014
Prize: $600

Web Arena UI - Match level multi-tasking support

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML, JavaScript
Dates: Nov 1 – 6, 2014
Prize: $600

SRT HTML5 SRT4 Path and Base Assembly

Technologies: Angular.js (1.0), HTML5, Java, Oracle 10g
Dates: Oct 29 – Nov 5, 2014
Prize: $600

Truvision v2 Android - Integration Assembly 4

Technologies: Android, Java
Dates: Oct 29 – Nov 5, 2014
Prize: $600

!!REPOST SAS Add Postgres Support Assembly

Technologies: JSP, Java, PostgreSQL
Dates: Oct 26 – 31, 2014
Prize: $600

Espresso iOS App - UI Updates Assembly

Technologies: Objective C, Xcode, iOS
Dates: Oct 20 – 31, 2014
Prize: $600

Cloud Broker Swift App - realworldswift

Technologies: Swift, Xcode, iOS
Dates: Oct 24 – 29, 2014
Prize: $600

SRT HTML5 UI Prototype Conversion 3

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Oct 22 – 29, 2014
Prize: $600

!FAST 72hrs !! Module Assembly - Web Arena Bug Fix 14.10 - 2

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML, JavaScript
Dates: Oct 25 – 28, 2014
Prize: $600

311 Reporting Mobile App PoC Assembly - realworldswift

Technologies: Swift, Xcode, iOS
Dates: Oct 22 – 28, 2014
Prize: $600

PZR Frontend Site Assembly

Technologies: JSP, Java, MySQL
Dates: Oct 22 – 27, 2014
Prize: $600

SRT Phase 4 - ET Release Assembly

Technologies: JSP, Java, Oracle 10g
Dates: Oct 21 – 27, 2014
Prize: $600

Fast 72hrs!! Web Arena UI - Member Feedback Widget

Technologies: Angular.js (1.0), Bootstrap, CSS, HTML, JavaScript
Dates: Oct 22 – 25, 2014
Prize: $600

Hercules - QMS Twilio Phone Number AutoAcquisition Challenge in Node.js!

Technologies: Node.js
Dates: Oct 20 – 23, 2014
Prize: $600

Styx Dashboard Webapp Integration Assembly #1

Technologies: .NET, ASP.NET, HTML5
Dates: Oct 17 – 23, 2014
Prize: $600

Styx MobileView iPad App Release Assembly

Technologies: PhoneGap, Xcode, iOS
Dates: Oct 15 – 22, 2014
Prize: $600

[Bug Bounty] - TC Web Arena PAY PER BUG FIX Challenge 1

Technologies: Angular.js (1.0), HTML, JavaScript, Node.js
Dates: Oct 11 – 17, 2014
Prize: $600

Truvision v2 iOS App Video Enhancement Assembly #2

Technologies: Objective C, Xcode, iOS
Dates: Oct 8 – 14, 2014
Prize: $600

SRT HTML5 UI Prototype Conversion 2

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Oct 8 – 13, 2014
Prize: $600

Truvision v2 Android - Integration Assembly 3

Technologies: Android, Java
Dates: Oct 4 – 10, 2014
Prize: $600

Cloud Broker Node/Bootstrap Implementation

Technologies: Angular.js (1.0), Bootstrap, Express, HTML, JSON, JavaScript, Node.js
Dates: Oct 2 – 8, 2014
Prize: $600
1st

Topcoder Arena Copilot

Dates: Oct 2 – 5, 2014
Prize: $150

FAST!! SRT Phase 4 - ET Assembly 3

Technologies: JSP, Java, Oracle 10g
Dates: Sep 30 – Oct 4, 2014
Prize: $600

PZR Frontend Initial Assembly

Technologies: JSP, Java, MySQL
Dates: Sep 25 – Oct 2, 2014
Prize: $600

Bonus Series!! SRT Phase 4 - ET Assembly 2

Technologies: JSP, Java, Oracle 10g
Dates: Sep 22 – 27, 2014
Prize: $600

Styx Database Metrics Collection Code Challenge

Technologies: .NET, C#, SQL
Dates: Sep 19 – 24, 2014
Prize: $600

SRT HTML5 UI Prototype Conversion 1

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Sep 18 – 23, 2014
Prize: $600

PZR DPM - Portfolio Report Assembly

Technologies: Java, MySQL
Dates: Sep 16 – 21, 2014
Prize: $600

SRT Phase 3 Pilot - Mozy and Xtrem and Vipr Tabs Assembly

Technologies: JSP, Java
Dates: Sep 11 – 19, 2014
Prize: $600

Brivo Reader and Credential iOS Apps Assembly

Technologies: Objective C, Xcode, iOS
Dates: Sep 12 – 16, 2014
Prize: $600

Bonus Series!! SRT Phase 4 - ET Assembly 1

Technologies: JSP, Java
Dates: Sep 3 – 13, 2014
Prize: $600

Truvision v2 Android - Integration Assembly 2

Technologies: Android, Java
Dates: Sep 4 – 11, 2014
Prize: $600

Nymi Provisioner iOS Mobile App

Technologies: Objective C, Xcode, iOS
Dates: Sep 3 – 9, 2014
Prize: $600

PZR Processing and Migration Code Updates Assembly

Technologies: Java, MySQL
Dates: Aug 31 – Sep 8, 2014
Prize: $600

PZR Frontend Module Architecture

Technologies: Java, MySQL
Dates: Sep 1 – 8, 2014
Prize: $600

!!FAST - Nymi Validator Minimal iOS App Assembly

Technologies: Xcode, iOS
Dates: Sep 5 – 8, 2014
Prize: $600

SRT Phase 3 Pilot - Mozy and Xtrem and Vipr Tabs UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Aug 31 – Sep 5, 2014
Prize: $600

Minimal iOS Reader and Credential App Using BLE and QR Scan

Technologies: Objective C, Xcode, iOS
Dates: Aug 30 – Sep 5, 2014
Prize: $600

VLC Multi-user Transcoding Service Assembly

Technologies: Python
Dates: Aug 28 – Sep 3, 2014
Prize: $600

SFDC Chatter iOS App Frontend - Groups, Profile and Misc Assembly

Technologies: Apex, HTML5, PhoneGap, SFDC Mobile, iOS
Dates: Aug 27 – Sep 2, 2014
Prize: $600

VLC for iOS Enhancement Assembly

Technologies: C++, Objective C, Xcode, iOS
Dates: Aug 27 – Sep 1, 2014
Prize: $600

Calix Mobile App v2.0 Bug Fixes Assembly

Technologies: Android, Angular.js (1.0), PhoneGap, Salesforce, iOS
Dates: Aug 24 – 29, 2014
Prize: $600

SRT Phase 4 - Estimation Tool UI Prototype Updates

Technologies: CSS, HTML, JavaScript
Dates: Aug 18 – 24, 2014
Prize: $600

topcoder reg2 - enable notification for new users

Technologies: JDBC, Java
Dates: Aug 21 – 24, 2014
Prize: $600

Survey Tool iOS Mobile App Assembly

Technologies: Objective C, REST, Xcode, iOS
Dates: Aug 19 – 24, 2014
Prize: $600

PZR Core Services Code Updates Assembly

Technologies: Java, MySQL
Dates: Aug 18 – 24, 2014
Prize: $600

VLC Multi-user Transcoding Service Module Architecture

Dates: Aug 12 – 18, 2014
Prize: $600

SRT Cloud Synchronization - Cloud App Assembly

Technologies: HTML, Java, Oracle 10g
Dates: Aug 10 – 16, 2014
Prize: $600

eBay GetHelp Bug Hunt for Android

Technologies: Android, HTML, Xcode, iOS
Dates: Aug 12 – 15, 2014
Prize: $600

SFDC Chatter iOS App Frontend - Login, Timeline and Topics Assembly

Technologies: Apex, HTML5, PhoneGap, SFDC Mobile, iOS
Dates: Aug 3 – 12, 2014
Prize: $600

Survey Tool Controllers And Services Assembly

Technologies: Java, MySQL
Dates: Aug 5 – 11, 2014
Prize: $600
1st

Wireless Telco Rate Plan Analysis Tool

Dates: Aug 6 – 9, 2014
Prize: $150

SRT Phase 4 - Estimation Tool UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Jul 31 – Aug 6, 2014
Prize: $600

SRT Phase 3 Merge Assembly

Technologies: JSP, Java
Dates: Aug 1 – 6, 2014
Prize: $600

Calix Mobile App UI Updates and Bug Fixes Assembly

Technologies: Android, Angular.js (1.0), HTML5, JavaScript, PhoneGap, iOS
Dates: Jul 26 – Aug 3, 2014
Prize: $600

SRT - Conversion to HTML5 Module Architecture

Technologies: CSS, HTML5, JavaScript
Dates: Jul 23 – 30, 2014
Prize: $600

Survey Tool Model And DAOs Assembly

Technologies: Java, MySQL, Spring
Dates: Jul 25 – 30, 2014
Prize: $600

SRT Phase 3-5 - BRS Tabs Part 3 Assembly

Technologies: JSP, Java
Dates: Jul 22 – 27, 2014
Prize: $600

PZR Architecture Updates

Technologies: Java, MySQL
Dates: Jul 16 – 27, 2014
Prize: $600

Galena Mobile App Base Assembly

Technologies: Java, Titanium
Dates: Jul 16 – 23, 2014
Prize: $600

!!REPOST - Truvision v2 iOS App Video Enhancement Assembly

Technologies: Objective C, Xcode, iOS
Dates: Jul 14 – 20, 2014
Prize: $600

!!FAST - Calix Mobile App Case View Pagination & RMA Line Item Assembly

Technologies: API, Angular.js (1.0), HTML5, JSON, JavaScript, REST
Dates: Jul 12 – 15, 2014
Prize: $600

Survey Tool Module Architecture

Technologies: HTML, Java, MySQL, Objective C, REST, iOS
Dates: Jul 9 – 15, 2014
Prize: $600

SRT Phase 3-5 - BRS Tabs Part 2 Assembly

Technologies: JSP, Java
Dates: Jul 10 – 15, 2014
Prize: $600

Survey Tool App UI Assembly

Technologies: Objective C, Xcode, iOS
Dates: Jul 9 – 14, 2014
Prize: $600

Truvision v2 Android - Backend Assembly 2

Technologies: Android, Java
Dates: Jul 7 – 13, 2014
Prize: $600

!!FAST - My Media Share Persistent Store Assembly

Technologies: MySQL, Node.js
Dates: Jul 9 – 12, 2014
Prize: $600

Truvision v2 Android - Integration Assembly 1

Technologies: Android, Java
Dates: Jul 5 – 12, 2014
Prize: $600

Media Share Server and Android App Bug Hunt

Technologies: Android, HTML, Node.js
Dates: Jul 9 – 11, 2014
Prize: $600

SRT Phase 3-1 - Implement VMWare Tab Assembly

Technologies: JSP, Java
Dates: Jul 5 – 10, 2014
Prize: $600

!!REPOST - SFDC Chatter Mobile App UI Prototype

Technologies: CSS, HTML5, JavaScript, jQuery Mobile
Dates: Jul 3 – 9, 2014
Prize: $600

Calix Mobile App Enhancements

Technologies: Android, PhoneGap, REST, iOS
Dates: Jun 29 – Jul 5, 2014
Prize: $600

Create Mobile UI Prototype Update

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript, PhoneGap
Dates: Jun 30 – Jul 5, 2014
Prize: $600

SRT Cloud Synchronization Module Architecture

Technologies: JSP, Java
Dates: Jun 29 – Jul 5, 2014
Prize: $600

DDS UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Jun 29 – Jul 4, 2014
Prize: $600

Calix SFDC Case List Pagination API REST Service Enhancement

Technologies: Apex, JSON, REST
Dates: Jun 27 – Jul 4, 2014
Prize: $600

SFDC Chatter Mobile App Services Assembly

Technologies: Apex, JavaScript, Salesforce
Dates: Jun 27 – Jul 4, 2014
Prize: $600

Galena Android Skeleton App

Technologies: Android, Titanium
Dates: Jun 28 – Jul 3, 2014
Prize: $600

!FAST - Media Share Test Scenarios

Technologies: Android, HTML, JavaScript, Node.js, iOS
Dates: Jun 28 – Jul 2, 2014
Prize: $600

Galena Mobile App Module Architecture

Technologies: Android, Titanium
Dates: Jun 24 – Jul 2, 2014
Prize: $600

SRT Phase 3-5 - BRS Tabs Part 1 Assembly

Technologies: JSP, Java
Dates: Jun 25 – Jul 1, 2014
Prize: $600

!REPOST - Media Share Server Load Test Suite

Technologies: Java, Node.js
Dates: Jun 26 – Jul 1, 2014
Prize: $600

SRT Phase 3-5 - BRS Tab UI Prototype Part 2

Technologies: CSS, HTML, JavaScript
Dates: Jun 24 – 30, 2014
Prize: $600

!!REPOST - SAS Frontend Dashboard and Schedule Assembly

Technologies: Java
Dates: Jun 23 – 29, 2014
Prize: $600

Truvision v2 Android - Backend Assembly 1

Technologies: Android, Java
Dates: Jun 22 – 28, 2014
Prize: $600

Estimation Tool Specification

Dates: Jun 22 – 28, 2014
Prize: $600

SRT Phase 3-1 - Atoms Centera and Vblock Tabs Assembly

Technologies: JSP, Java
Dates: Jun 20 – 26, 2014
Prize: $600

SRT Phase 3-3 - Implement Isilon and ViPR Tabs Assembly

Technologies: JSP, Java
Dates: Jun 20 – 25, 2014
Prize: $600

PZR Core - Portfolio, Notification, Security Service and Jobs Assembly

Technologies: Java, MySQL
Dates: Jun 18 – 23, 2014
Prize: $600

SRT Phase 2 Release Assembly

Technologies: Java
Dates: Jun 18 – 23, 2014
Prize: $600

SRT Phase 3-4 - ASD and Healthcheck Tabs Assembly

Technologies: JSP, Java
Dates: Jun 16 – 21, 2014
Prize: $600

SRT Phase 3-2 - Implement SRM and Update Change Request and Move Request Tabs Assembly

Technologies: JSP, Java
Dates: Jun 16 – 21, 2014
Prize: $600

SFDC Chatter Module Architecture

Technologies: Android, CSS, HTML5, JavaScript, PhoneGap, REST, Salesforce, iOS
Dates: Jun 10 – 18, 2014
Prize: $600

SOX Certification Application - Questionnaire UI

Technologies: Apex, Salesforce, Visualforce
Dates: Jun 9 – 15, 2014
Prize: $600

SRT Phase 3-5 - BRS Tab UI Prototype Part 1

Technologies: CSS, HTML, JavaScript
Dates: Jun 9 – 15, 2014
Prize: $600

My Media Share - Supporting Video Uploads

Technologies: Node.js
Dates: Jun 5 – 12, 2014
Prize: $600

SRT Phase 3-3 - Isilon and Vipr Tabs UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Jun 6 – 11, 2014
Prize: $600

SRT Phase 3-1 - CTA Rainfinity and MSS Tabs Update Assembly

Technologies: JSP, Java
Dates: Jun 3 – 8, 2014
Prize: $600

SRT Phase 3-4 - ASD and Healthcheck Tabs UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Jun 3 – 8, 2014
Prize: $600

SRT Phase 3-2 - SRM and VMWare Tabs UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Jun 3 – 8, 2014
Prize: $600

PZR DPM - Migration Assembly

Technologies: Java, MySQL
Dates: Jun 2 – 7, 2014
Prize: $600

TC Design Contest Loader

Technologies: Java, SQL
Dates: May 30 – Jun 4, 2014
Prize: $600

!!REPOST - Planning and Zoning Report System Core - Misc Services Module Assembly

Technologies: Java, MySQL
Dates: May 26 – Jun 1, 2014
Prize: $600

MyMediaShare (PCDVR & Min Config Integration) - File Save Assembly

Technologies: JavaScript, Node.js
Dates: May 24 – 30, 2014
Prize: $600

Funktional Tracker Release Assembly 3

Technologies: Java, MySQL
Dates: May 23 – 29, 2014
Prize: $600

!!REPOST - Museum Store Storyboard iPad App Assembly

Technologies: Objective C, iOS
Dates: May 13 – 21, 2014
Prize: $600

TCS Data Loader Updates Assembly

Technologies: Java, SQL
Dates: May 13 – 17, 2014
Prize: $600

!FAST - Min Config Server Updates Assembly 2

Technologies: HTML, JavaScript, Node.js
Dates: May 14 – 17, 2014
Prize: $600

!FAST - Calix Mobile Browser Detect Code

Technologies: Android, Salesforce, Visualforce, iOS
Dates: May 13 – 16, 2014
Prize: $600

!!REPOST - SAS Frontend Initial Assembly

Technologies: Java, JavaScript
Dates: May 11 – 16, 2014
Prize: $600

Funktional Tracker Release Assembly 2

Technologies: Java, MySQL
Dates: May 10 – 16, 2014
Prize: $600

SRT Phase 3-3 - Isilon and Residency Tabs Assembly

Technologies: Java
Dates: May 9 – 15, 2014
Prize: $600

SRT Phase 3-2 - W4N and Unfunded Project Tabs Assembly

Technologies: Java
Dates: May 9 – 15, 2014
Prize: $600

Media Share Android App Part 2 Assembly

Technologies: Android, PhoneGap
Dates: May 8 – 14, 2014
Prize: $600

SRT Phase 3-1 - CTA Rainfinity and MSS Tabs Assembly

Technologies: Java
Dates: May 6 – 12, 2014
Prize: $600

Convert Cloud Site Prototype To Drupal Template Assembly

Technologies: HTML, PHP
Dates: May 6 – 12, 2014
Prize: $600

Truvision v2 Final Bug Hunt

Technologies: Objective C, iOS
Dates: May 10 – 12, 2014
Prize: $600
1st

Cloud Architecture & Mobile App Copilot Challenge

Dates: May 6 – 9, 2014
Prize: $150

!!REPOST - PZR Core - Models, Exceptions and Generic Service Assembly

Technologies: Java, MySQL
Dates: May 2 – 9, 2014
Prize: $600

!FAST - Min Config Server Updates Assembly

Technologies: HTML, JavaScript, Node.js
Dates: May 5 – 9, 2014
Prize: $600

TruVision v2 Final Integration Assembly

Technologies: Objective C, iOS
Dates: Apr 30 – May 7, 2014
Prize: $600

eBay -GetHelp Android Phonegap Build and Enhancements to existing App

Technologies: API, Android, CSS, HTML5, JSON, JavaScript, MongoDB, Node.js, PhoneGap, Xcode, iOS
Dates: Apr 28 – May 5, 2014
Prize: $600

SRT Phase 3-3 - BRS Tab Assembly

Technologies: Java
Dates: Apr 28 – May 3, 2014
Prize: $600

FUNKO Mini Game Prototype

Technologies: CSS, HTML, JavaScript
Dates: Apr 26 – May 1, 2014
Prize: $600

Planning and Zoning Report System Data Processing and Migration Module Architecture

Technologies: Java, MySQL
Dates: Apr 26 – May 1, 2014
Prize: $600

Media Share Android App Part 1 Assembly

Technologies: Android, PhoneGap
Dates: Apr 26 – May 1, 2014
Prize: $600

SRT Phase 3-2 - Move Request and Change Request Tabs Assembly

Technologies: Java
Dates: Apr 26 – May 1, 2014
Prize: $600

SOX Certification Application - Core UI

Technologies: Apex, Salesforce, Visualforce
Dates: Apr 24 – 30, 2014
Prize: $600

Asset Search Integration Assembly

Technologies: Apex, Java, Salesforce
Dates: Apr 23 – 29, 2014
Prize: $600

Truvision UI Functions Bug Hunt

Technologies: iOS
Dates: Apr 25 – 27, 2014
Prize: $600

SOX Certification Application - Reports

Technologies: Apex, Salesforce, Visualforce
Dates: Apr 15 – 23, 2014
Prize: $600

!FAST- Asset Search REST Services Upgrade Assembly

Technologies: Java, REST
Dates: Apr 15 – 18, 2014
Prize: $600

TruVision v2 LNVR Video Integration Release Assembly 1

Technologies: Objective C, iOS
Dates: Apr 11 – 16, 2014
Prize: $600

Planning and Zoning Report System Core Services Module Architecture

Technologies: Java, MySQL
Dates: Apr 10 – 15, 2014
Prize: $600

eBay - Lets mobilize the GetHelp App with Phonegap for iOS

Technologies: API, Android, CSS, HTML5, JSON, JavaScript, MongoDB, Node.js, PhoneGap, iOS
Dates: Apr 5 – 14, 2014
Prize: $600

TruVision v2 iPad UI Assembly 3

Technologies: iOS
Dates: Apr 8 – 13, 2014
Prize: $600

FAST - Min Config Server Multi-Session Assembly

Technologies: HTML, JavaScript, Node.js
Dates: Apr 9 – 13, 2014
Prize: $600

Module Assembly - PXV2 Front End Admin Role Assembly

Technologies: .NET 4.0
Dates: Apr 7 – 13, 2014
Prize: $600

TruVision v2 iOS Backend Module Assembly 2

Technologies: iOS
Dates: Apr 2 – 10, 2014
Prize: $600

TruVision v2 Test Scenarios 2

Technologies: iOS
Dates: Apr 4 – 10, 2014
Prize: $600

REPOST - SAS Backend Misc Services Assembly

Technologies: Java
Dates: Apr 2 – 8, 2014
Prize: $600

SOX Certification Application - Salesforce Configuration

Technologies: Salesforce
Dates: Apr 4 – 7, 2014
Prize: $600

REPOST - SAS Backend Core Services Assembly

Technologies: Java
Dates: Apr 2 – 7, 2014
Prize: $600

TruVision v2 iPhone UI Assembly 2

Technologies: iOS
Dates: Mar 31 – Apr 5, 2014
Prize: $600

SRT Phase 2 - Solutions Tab Assembly

Technologies: Java
Dates: Mar 27 – Apr 2, 2014
Prize: $600

Service Request Tool UI Prototype 3

Technologies: CSS, HTML, JavaScript
Dates: Mar 28 – Apr 2, 2014
Prize: $600

TruVision v2 iPad LNVR Video Integration Bug Hunt 1

Technologies: iOS
Dates: Mar 31 – Apr 2, 2014
Prize: $600
2nd

Workday Data Toolkit - Game Plan 1

Dates: Mar 28 – Apr 1, 2014
Prize: $150

Service Request Tool UI Prototype 2

Technologies: CSS, HTML, JavaScript
Dates: Mar 27 – Apr 1, 2014
Prize: $600

SAS Backend Jobs and Export Service Assembly

Technologies: Java
Dates: Mar 27 – Apr 1, 2014
Prize: $600

eBay - GetHelp Mobile WebApp Challenge

Technologies: Angular.js (1.0), CSS, HTML5, JQuery, JavaScript, MongoDB, Node.js, REST
Dates: Mar 24 – 31, 2014
Prize: $600

TruVision v2 iPad UI Assembly 2

Technologies: iOS
Dates: Mar 25 – 30, 2014
Prize: $600

TruVision v2 iPad LNVR Video Integration Assembly 1

Technologies: Objective C, iOS
Dates: Mar 24 – 29, 2014
Prize: $600

Planning and Zoning Report System System Architecture

Technologies: HTML, Java, JavaScript, MySQL, Spring
Dates: Mar 21 – 28, 2014
Prize: $600

Calix Mobile iOS App Integration Assembly

Technologies: PhoneGap, REST, Salesforce, iOS
Dates: Mar 22 – 27, 2014
Prize: $600

TruVision v2 iPhone UI Assembly 1

Technologies: iOS
Dates: Mar 20 – 25, 2014
Prize: $600

TruVision v2 Test Scenarios 1

Technologies: iOS
Dates: Mar 19 – 25, 2014
Prize: $600

Min Config Native App Conversion Assembly

Technologies: iOS
Dates: Mar 20 – 25, 2014
Prize: $600

FAST - SAS UI Prototype Update

Technologies: CSS, HTML, JavaScript
Dates: Mar 22 – 25, 2014
Prize: $600

ACME SOX Module Architecture

Technologies: Apex, Salesforce, Visualforce
Dates: Mar 16 – 23, 2014
Prize: $600

eBay Get Help Frontend Integration Challenge

Technologies: Angular.js (1.0), CSS, HTML5, JQuery, JavaScript, MongoDB, Node.js, REST
Dates: Mar 12 – 18, 2014
Prize: $600

Asset Search Frontend Assembly

Technologies: Angular.js (1.0), Salesforce
Dates: Mar 10 – 18, 2014
Prize: $600

Service Request Tool UI Prototype 1

Technologies: CSS, HTML, JavaScript
Dates: Mar 13 – 18, 2014
Prize: $600

Min Config Alpha App Assembly

Technologies: PhoneGap, iOS
Dates: Mar 12 – 17, 2014
Prize: $600

!FAST - Min Config Alpha App Server Implementation Assembly

Technologies: HTML, Node.js
Dates: Mar 12 – 16, 2014
Prize: $600

TruVision v2 iPad UI Assembly 1

Technologies: iOS
Dates: Mar 11 – 16, 2014
Prize: $600

TC Direct Rebranding Assembly Copilot and Reporting related pages

Technologies: CSS, EJB 3, HTML, JSP, JavaScript, Struts
Dates: Mar 9 – 14, 2014
Prize: $600

Asset Search REST Services Assembly

Technologies: Java, REST
Dates: Mar 7 – 14, 2014
Prize: $600

TC Direct Rebranding Assembly Dashboard and Admin related pages

Technologies: CSS, EJB 3, HTML, JSP, Java, JavaScript
Dates: Mar 7 – 13, 2014
Prize: $600

Calix Mobile API Assembly

Technologies: Angular.js (1.0), REST
Dates: Mar 5 – 13, 2014
Prize: $600

Atalanta Reservations Argument Challenge - SF Based Architecture

Technologies: Salesforce
Dates: Feb 28 – Mar 11, 2014
Prize: $600

SAS Backend Models and Exceptions Assembly

Technologies: Java
Dates: Mar 5 – 10, 2014
Prize: $600

SFDC and RSS Integration Code Challenge

Technologies: Salesforce
Dates: Feb 28 – Mar 9, 2014
Prize: $600

TC Direct Rebranding Assembly Project and Contest related pages

Technologies: CSS, HTML, JSP, Java
Dates: Mar 4 – 9, 2014
Prize: $600

Atalanta Reservations SF Based System Architecture

Technologies: Salesforce
Dates: Feb 28 – Mar 8, 2014
Prize: $600

Atalanta Reservations CMS Based System Architecture

Dates: Feb 28 – Mar 7, 2014
Prize: $600

Min Config PoC Assembly 2

Technologies: iOS
Dates: Mar 1 – 7, 2014
Prize: $600

Truvision v2 iOS Backend Module Assembly 1

Technologies: Objective C, iOS
Dates: Feb 28 – Mar 6, 2014
Prize: $600

SFDC and Social Integration Code Challenge

Technologies: Salesforce
Dates: Feb 28 – Mar 6, 2014
Prize: $600

72h - Min Config UI Prototype

Technologies: Angular.js (1.0), CSS, HTML5, JavaScript
Dates: Mar 3 – 6, 2014
Prize: $600

QMarket Update Module Assembly

Technologies: .NET, VB.NET
Dates: Feb 28 – Mar 5, 2014
Prize: $600

Calix Mobile Android Native Module Assembly

Technologies: Android
Dates: Feb 25 – Mar 2, 2014
Prize: $600

Calix Mobile iOS Native Module Assembly

Technologies: iOS
Dates: Feb 25 – Mar 2, 2014
Prize: $600

Build a Hybrid Mobile App to provide an immersive Support Experience

Technologies: Angular.js (1.0), CSS, HTML5, JSON, JavaScript, MongoDB, Node.js, REST, jQuery
Dates: Feb 19 – 28, 2014
Prize: $600

Min Config PoC Load Testing

Technologies: HTTP
Dates: Feb 21 – 27, 2014
Prize: $600

48h - Asset Search UI Prototype

Technologies: Angular.js (1.0), CSS, HTML
Dates: Feb 22 – 24, 2014
Prize: $600

Min Config PoC Assembly

Technologies: Objective C, PhoneGap, iOS
Dates: Feb 19 – 24, 2014
Prize: $600

TC Direct Rebranding UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Feb 18 – 23, 2014
Prize: $600

QMarket Update Module Architecture

Technologies: MSMQ, VB.NET
Dates: Feb 17 – 22, 2014
Prize: $600

Seto ROLF Bug Hunt

Technologies: Apex, Salesforce
Dates: Feb 18 – 20, 2014
Prize: $600

SRT Release Assembly - Unified Tab and Misc

Technologies: Java
Dates: Feb 12 – 18, 2014
Prize: $600

FAST - Salesforce Account Geolocation using Bing Maps API PoC Assembly Part 2

Technologies: Apex
Dates: Feb 13 – 16, 2014
Prize: $600

Funktional Tracker Release Assembly

Technologies: Java
Dates: Feb 12 – 15, 2014
Prize: $600

SAS Module Architecture

Technologies: Java
Dates: Feb 8 – 15, 2014
Prize: $600

SRT Release Assembly - BC Tab

Technologies: Java
Dates: Feb 9 – 14, 2014
Prize: $600

SRT Release Assembly - Mainframe Tab

Technologies: Java
Dates: Feb 9 – 14, 2014
Prize: $600

Calix Mobile REST Services Module Assembly

Technologies: Apex, Salesforce
Dates: Feb 8 – 13, 2014
Prize: $600
2nd

American Express Member Rewards Program Project!

Dates: Feb 7 – 13, 2014
Prize: $100

Randivoo v2 SAM and Config Update Release Assembly

Technologies: iOS
Dates: Feb 5 – 12, 2014
Prize: $600

Salesforce Account Geolocation using Bing Maps API PoC Assembly

Technologies: Apex, JavaScript
Dates: Feb 7 – 12, 2014
Prize: $600

!FAST - Calix Mobile UI Prototype

Technologies: CSS, HTML5, JavaScript
Dates: Feb 7 – 11, 2014
Prize: $600

TopCoder Discourse Forum PoC Assembly

Technologies: PostgreSQL, Redis, Ruby on Rails
Dates: Feb 3 – 8, 2014
Prize: $600

Customer Web Portal Mobile Site Assembly

Technologies: .NET, ASP.NET, C#
Dates: Feb 3 – 8, 2014
Prize: $600

SRT Release Assembly - Base

Technologies: Java
Dates: Feb 1 – 6, 2014
Prize: $600

REPOST - TopCoder NodeBB Forum PoC Assembly

Technologies: Node.js, Redis
Dates: Jan 30 – Feb 4, 2014
Prize: $600

Planning and Zoning Report System Conceptualization

Dates: Jan 24 – 31, 2014
Prize: $600

Funktional Tracker Frontend Admin Assembly

Technologies: Java
Dates: Jan 21 – 27, 2014
Prize: $600

Customer Web Portal Mobile Site UI Prototype

Technologies: CSS, HTML5, JavaScript
Dates: Jan 20 – 25, 2014
Prize: $600

Asset Search Service Amazon CloudSearch Filters and Sorting PoC Assembly

Technologies: HTML, JavaScript
Dates: Jan 20 – 25, 2014
Prize: $600
1st

Calix Mobile - Copilot

Dates: Jan 21 – 24, 2014
Prize: $150

48hr Cockpit Group Management Improvement Release Assembly

Technologies: Java
Dates: Jan 17 – 19, 2014
Prize: $600

Issue Tracking Grading Web Application Release Assembly

Technologies: Java
Dates: Jan 7 – 12, 2014
Prize: $600

Plan Design Survey Module Assembly

Technologies: .NET, ASP.NET
Dates: Jan 6 – 11, 2014
Prize: $600

!!FAST - Cockpit Improve Group Management Module Architecture

Technologies: Java
Dates: Jan 7 – 10, 2014
Prize: $600

!REPOST - Funktional Tracker Frontend Sign Up and Tracker Assembly

Technologies: Java
Dates: Jan 4 – 10, 2014
Prize: $600

Randivoo v2 Badge Printing Module Assembly

Technologies: iOS
Dates: Dec 31, 2013 – Jan 6, 2014
Prize: $600

Asset Search Service Amazon CloudSearch PoC Assembly

Technologies: JavaScript
Dates: Dec 31, 2013 – Jan 5, 2014
Prize: $600

Issue Tracking Grading Web Application Frontend Module Assembly

Technologies: Java
Dates: Dec 18 – 23, 2013
Prize: $600

Styx MobileView iPad App Frontend Module Assembly

Technologies: iOS
Dates: Dec 14 – 21, 2013
Prize: $600
1st

Ponos Investment Platform Copilot Opportunity

Dates: Dec 16 – 19, 2013
Prize: $150

!!!FAST - ABO SQL Improvements Assembly

Technologies: SQL, SQL Server, SQL Server 2008
Dates: Dec 16 – 19, 2013
Prize: $600

!!!REPOST - Service Request Tool Frontend Assembly

Technologies: Java
Dates: Dec 5 – 10, 2013
Prize: $600
1st

Asset Search Service Copilot

Dates: Dec 6 – 9, 2013
Prize: $150

Issue Tracking Grading Web Application Backend Services Assembly

Technologies: Java
Dates: Dec 1 – 6, 2013
Prize: $600

Midas Analytics Engine General Services Module Assembly

Technologies: Java
Dates: Nov 28 – Dec 3, 2013
Prize: $600
1st

eBay Get IT Help Hybrid-Mobile Application

Dates: Nov 26 – 29, 2013
Prize: $150

Issue Tracking Grading Web Application Module Architecture

Technologies: Java
Dates: Nov 16 – 23, 2013
Prize: $600

Module Assembly - CloudSpokes Contest Data Loader Part 2

Technologies: Java
Dates: Nov 8 – 14, 2013
Prize: $600

!!48h - Desktop CI Build Light PoC Assembly

Technologies: .NET 3.5
Dates: Nov 7 – 9, 2013
Prize: $600

BrivoLabs WorePress Theme - Responsive Web Design UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Oct 31 – Nov 7, 2013
Prize: $600

Crowdsourced Application Security Standards and Review

Dates: Oct 25 – Nov 3, 2013
Prize: $600

Module Assembly - CloudSpokes Contest Data Loader Part 1

Technologies: Java
Dates: Oct 28 – Nov 1, 2013
Prize: $600

Customer Web Portal Release Assembly Part 2

Technologies: .NET
Dates: Oct 26 – Nov 1, 2013
Prize: $600

Midas Analytics Engine Frontend Module Architecture

Technologies: Java
Dates: Oct 24 – Nov 1, 2013
Prize: $600

VMS iPad App Module Assembly

Technologies: PhoneGap, iOS 6.0
Dates: Oct 25 – Nov 1, 2013
Prize: $600

Employee Product Issue Reporter Conceptualization

Dates: Oct 13 – 31, 2013
Prize: $600

Java DB Configs Import Export and Compare

Technologies: Java
Dates: Oct 25 – 30, 2013
Prize: $600

Java Throttle

Technologies: Java
Dates: Oct 25 – 29, 2013
Prize: $600

Midas Analytics Engine General Services Module Architecture

Technologies: Java
Dates: Oct 23 – 28, 2013
Prize: $600

HACS Security Model and Admin Console Module Assembly

Technologies: .NET, ASP.NET
Dates: Oct 22 – 27, 2013
Prize: $600

Mobile Retail Store Map Conceptualization

Dates: Oct 13 – 23, 2013
Prize: $600

Customer Web Portal Mobile Version Module Architecture

Technologies: .NET
Dates: Oct 17 – 22, 2013
Prize: $600

Midas Analytics Engine Metric Data Services Module Architecture

Technologies: Java
Dates: Oct 17 – 22, 2013
Prize: $600
1st

QMarket Software Copilot Opportunity

Dates: Oct 17 – 20, 2013
Prize: $150

!FAST - 48h VMS iPad App UI Prototype

Technologies: HTML5, PhoneGap
Dates: Oct 18 – 20, 2013
Prize: $600
1st

PZR E-Business Platform Redesign and Development

Dates: Oct 16 – 19, 2013
Prize: $150

Java DB Configs Import Export and Compare

Technologies: Java
Dates: Oct 15 – 19, 2013
Prize: $600

Java Throttle

Technologies: Java
Dates: Oct 15 – 19, 2013
Prize: $600

Service Request Tool Backend Assembly

Technologies: Java
Dates: Oct 11 – 17, 2013
Prize: $600
1st

Issue Tracking Grading Web Application

Dates: Oct 12 – 15, 2013
Prize: $150

!!!REPOST - Styx MobileView iPad App Audio PoC Assembly

Technologies: iOS 6.0
Dates: Oct 8 – 14, 2013
Prize: $600

Module Assembly - CloudSpokes Accounts Loader Assembly

Technologies: Java
Dates: Oct 2 – 8, 2013
Prize: $600
1st

Mobile Retail Store Map

Dates: Sep 30 – Oct 3, 2013
Prize: $150
1st

Vending Order Mobile Application Copilot Opportunity

Dates: Sep 26 – 30, 2013
Prize: $150

Service Request Tool Module Architecture

Technologies: Java
Dates: Sep 20 – 27, 2013
Prize: $600

Customer Web Portal Release Assembly Part 1

Technologies: .NET
Dates: Sep 20 – 26, 2013
Prize: $600

Styx MobileView iPad App UI Prototype

Technologies: Sencha Touch 2
Dates: Sep 18 – 24, 2013
Prize: $600

GLT innovation Idea Generation

Dates: Sep 19 – 23, 2013
Prize: $600

Funktional Tracker Frontend Core Module Assembly

Technologies: Java
Dates: Sep 17 – 23, 2013
Prize: $600

EMP Panels Phase 5 Test Suite

Technologies: Java
Dates: Sep 13 – 19, 2013
Prize: $600

Customer Web Portal Bug Hunt

Technologies: .NET, ASP.NET
Dates: Sep 14 – 16, 2013
Prize: $600
1st

GLT innovation Copilot Opportunity

Dates: Sep 11 – 14, 2013
Prize: $150

Release Assembly - TC Cockpit Misc Bug Fixes

Technologies: Java
Dates: Sep 9 – 14, 2013
Prize: $600

EMP Panels Phase 3C Test Suite

Technologies: Java
Dates: Sep 6 – 13, 2013
Prize: $600

Variable Interest Entities Consolidation Release Assembly

Technologies: .NET
Dates: Sep 1 – 7, 2013
Prize: $600

EMP Panels Phase 3B Test Suite

Technologies: Java
Dates: Sep 1 – 6, 2013
Prize: $600

EMP Panels Phase 3A Test Suite

Technologies: Java
Dates: Aug 28 – Sep 2, 2013
Prize: $600

EMP Panels Phase 4 Test Suite

Technologies: Java
Dates: Aug 23 – 29, 2013
Prize: $600

EMP Panels Phase 4 Integration Assembly

Technologies: Java
Dates: Aug 20 – 26, 2013
Prize: $600

Styx Mobile App Android Penta 16 and TVN40 Integration Assembly Bug Hunt

Technologies: Android
Dates: Aug 21 – 23, 2013
Prize: $600

Module Assembly - Customer Web Portal 4th Funtional Assembly

Technologies: .NET
Dates: Aug 15 – 23, 2013
Prize: $600

EMP Panels Phase 2 Test Suite

Technologies: Java
Dates: Aug 17 – 23, 2013
Prize: $600
1st

Seto-ROLF on Salesforce Copilot

Dates: Aug 19 – 22, 2013
Prize: $150

Midas Analytics Engine System Architecture

Technologies: Java
Dates: Aug 13 – 20, 2013
Prize: $600

EMP Panels Phase 2 Integration Assembly

Technologies: Java
Dates: Aug 13 – 19, 2013
Prize: $600

Mobile Event App Conceptualization

Dates: Aug 11 – 18, 2013
Prize: $600
1st

Employee Product Issue Reporter Copilot Opportunity

Dates: Aug 14 – 17, 2013
Prize: $150
1st

Seto - Package Update Management System Copilot

Dates: Aug 13 – 16, 2013
Prize: $150

Variable Interest Entities Consolidation VIEC Frontend Assembly

Technologies: .NET
Dates: Aug 7 – 13, 2013
Prize: $600

Variable Interest Entities Consolidation Core Frontend Part 2 Assembly

Technologies: .NET
Dates: Aug 7 – 13, 2013
Prize: $600

Release Assembly - TC Cockpit JIRA Report Update

Technologies: Java
Dates: Jul 29 – Aug 5, 2013
Prize: $600

Release Assembly - TC Cockpit Bug Race Cost and Fees Part 2

Technologies: Java
Dates: Jul 26 – Aug 2, 2013
Prize: $600
1st

Service Request From Application

Dates: Jul 29 – Aug 1, 2013
Prize: $100
1st

mobile application for corporate events

Dates: Jul 29 – Aug 1, 2013
Prize: $150

EMP Panels Phase 4 Switch Controllers and Pages Assembly

Technologies: Java
Dates: Jul 27 – Aug 1, 2013
Prize: $600

REPOST!!! Variable Interest Entities Consolidation Core Frontend Part 1 Assembly

Technologies: .NET
Dates: Jul 25 – 30, 2013
Prize: $600

EMP Panels Phase 4 Fabric Controllers and Pages Assembly

Technologies: Java
Dates: Jul 25 – 30, 2013
Prize: $600

EMP Panels Phase 4 Host Controllers and Pages and Common Parts Assembly

Technologies: Java
Dates: Jul 22 – 27, 2013
Prize: $600
1st

Hercules Xfinity Sweeps Copilot Opportunity

Dates: Jul 23 – 25, 2013
Prize: $200

EMP Panels Generic Test Suite

Technologies: Java
Dates: Jul 19 – 24, 2013
Prize: $600

Module Assembly - Customer Web Portal 3rd Funtional Assembly

Technologies: .NET
Dates: Jul 16 – 24, 2013
Prize: $600

Variable Interest Entities Consolidation VIEC Services Backend Assembly

Technologies: .NET
Dates: Jul 18 – 24, 2013
Prize: $600
1st

Laboratory Audit Application - Tablet

Dates: Jul 19 – 22, 2013
Prize: $150

EMP Panels Phase 2 Symmetrix Array and System Bay Controllers and Pages Assembly

Technologies: Java
Dates: Jul 14 – 19, 2013
Prize: $600

Trackster Blog Wordpress Theme Build

Technologies: CSS, HTML, JavaScript, MySQL, PHP
Dates: Jul 14 – 19, 2013
Prize: $600

REPOST!!! Trackster UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Jul 10 – 17, 2013
Prize: $600

Variable Interest Entities Consolidation Core Services Backend Part 2 Assembly

Technologies: .NET
Dates: Jul 6 – 12, 2013
Prize: $600

Module Assembly - Customer Web Portal 2nd Functional Assembly

Technologies: .NET
Dates: Jun 27 – Jul 5, 2013
Prize: $600

Variable Interest Entities Consolidation VIEC Frontend Module Architecture

Technologies: .NET
Dates: Jun 27 – Jul 4, 2013
Prize: $600

Variable Interest Entities Consolidation Core Frontend Module Architecture

Technologies: .NET
Dates: Jun 21 – 28, 2013
Prize: $600

Capital Management Conceptualization

Dates: Jun 12 – 22, 2013
Prize: $600

Module Assembly - Trackster Backend Part 2 Assembly

Technologies: Java
Dates: Jun 15 – 21, 2013
Prize: $600

Trackster Frontend Module Architecture

Technologies: Java
Dates: Jun 11 – 19, 2013
Prize: $600

REPOST!!! Module Assembly - Customer Web Portal 1st Funtional Assembly

Technologies: .NET 4.0
Dates: Jun 13 – 19, 2013
Prize: $600

Variable Interest Entities Consolidation VIEC Services Module Architecture

Technologies: .NET
Dates: Jun 13 – 19, 2013
Prize: $600

REPOST!!! Release Assembly - TC Cockpit Bug Race Cost and Fees Part 1

Technologies: Java
Dates: Jun 11 – 17, 2013
Prize: $600

Consumer Loyalty Gamification Idea Generation

Dates: Jun 11 – 16, 2013
Prize: $600

System Assembly - Variable Interest Entities Consolidation Assembly

Technologies: .NET
Dates: Jun 11 – 16, 2013
Prize: $600

Styx Mobile App Android v1dot3 Playback Bug Hunt

Technologies: Java
Dates: Jun 11 – 13, 2013
Prize: $600

Release Assembly - Benchmarking and Reporting Tool Rewrite Release 1 Assembly 2

Technologies: Java
Dates: Jun 6 – 12, 2013
Prize: $600

Module Assembly - Trackster Backend Part 1 Assembly

Technologies: Java
Dates: Jun 4 – 10, 2013
Prize: $600
1st

Capital Management Web App

Dates: Jun 3 – 6, 2013
Prize: $150

Release Assembly - Benchmarking and Reporting Tool Rewrite Release 1 Assembly 1

Technologies: Java
Dates: May 29 – Jun 4, 2013
Prize: $600
1st

Customer Loyalty Gamification

Dates: May 29 – Jun 1, 2013
Prize: $150

Module Assembly - Styx Mobile App Android v1dot3 Playback Assembly

Technologies: Java
Dates: May 26 – Jun 1, 2013
Prize: $600

Variable Interest Entities Consolidation System Architecture

Technologies: .NET
Dates: May 16 – 26, 2013
Prize: $600

Styx Mobile App Android Phone Gap Version 1dot3 Assembly Bug Hunt

Technologies: Android 2.2
Dates: May 22 – 24, 2013
Prize: $600

Midas Analytics Engine Conceptualization

Dates: May 16 – 23, 2013
Prize: $600

Release Assembly - TC Cockpit Project Total Cost Fixes

Technologies: Java
Dates: May 11 – 19, 2013
Prize: $600

Release Assembly - Styx Mobile App Android v1dot3 GUI Update Assembly

Technologies: Android 2.2
Dates: May 10 – 17, 2013
Prize: $600

Module Assembly - Lost Highways Frontend Assembly

Technologies: .NET 4.0
Dates: May 2 – 10, 2013
Prize: $600

Module Assembly - PXV2 E-Catalog Assembly

Technologies: .NET
Dates: Apr 28 – May 9, 2013
Prize: $600

Module Assembly - PXV2 Front End Customer Role Part 2 Assembly

Technologies: .NET
Dates: Apr 22 – 28, 2013
Prize: $600

Proof of Concept - Styx Mobile Video App v1-3 Android Proof of Concept Assembly

Technologies: HTML, HTML5, HTTP, JavaScript
Dates: Apr 22 – 27, 2013
Prize: $600

Module Assembly - Customer Web Portal Core Assembly

Technologies: .NET 4.0
Dates: Apr 14 – 21, 2013
Prize: $600

Module Assembly - Lost Highways Assembly 1

Technologies: .NET 4.0
Dates: Apr 13 – 19, 2013
Prize: $600

Talos - Javascript Popup Widget

Technologies: JavaScript
Dates: Apr 13 – 18, 2013
Prize: $600

Module Assembly - Forecast Unit Cost Tool Struts2 Action Part 2 Assembly

Technologies: Java
Dates: Apr 8 – 13, 2013
Prize: $600

Module Assembly - Forecast Volume Tool Struts2 Action Part 2 Assembly

Technologies: Java
Dates: Apr 8 – 13, 2013
Prize: $600

Module Assembly - PXV2 Front End Customer Role Part 1 Assembly

Technologies: .NET 4.0, ASP.NET, C#
Dates: Apr 1 – 11, 2013
Prize: $600

Trackster Backend Module Architecture

Technologies: Java
Dates: Apr 2 – 7, 2013
Prize: $600
1st

Tracking Hours

Dates: Apr 1 – 4, 2013
Prize: $150
1st

Midas - Analytics Engine Web App

Dates: Apr 1 – 4, 2013
Prize: $150

Variable Interest Entities Consolidation Conceptualization

Dates: Mar 27 – Apr 2, 2013
Prize: $600

REPOST!! Module Assembly - Forecast Volume Tool Struts2 Action Part 1 Assembly

Technologies: Java
Dates: Mar 25 – 31, 2013
Prize: $600

Release Assembly - TV and Movie Rating Game Assembly 2

Technologies: HTML, HTML5, Java, JavaScript, MySQL
Dates: Mar 21 – 27, 2013
Prize: $600

Release Assembly - Impact X Launch Site Assembly

Technologies: CSS, HTML5, Java, JavaScript, MySQL
Dates: Mar 21 – 26, 2013
Prize: $600

FAST!! Talos - Javascript Popup Widget

Technologies: JavaScript
Dates: Mar 21 – 25, 2013
Prize: $600

PXV2 Front End Component Part 2

Technologies: .NET 4.0, ASP.NET, C#
Dates: Mar 18 – 24, 2013
Prize: $600
1st

Web Portal for Line of Business Applications and App

Dates: Mar 20 – 23, 2013
Prize: $150

PXV2 Front End Component Part 3

Technologies: .NET 4.0, ASP.NET, C#
Dates: Mar 18 – 23, 2013
Prize: $600

PXV2 Front End Component Part 1

Technologies: .NET 4.0, ASP.NET, C#
Dates: Mar 18 – 23, 2013
Prize: $600

Trackster System Architecture

Technologies: Java
Dates: Mar 13 – 21, 2013
Prize: $600

REPOST!!! - Benchmarking and Reporting Tool Rewrite Release 1 Import Content Management

Technologies: EJB 3, Java
Dates: Mar 16 – 20, 2013
Prize: $600

Module Assembly - Forecast Unit Cost Tool Struts2 Action Part 1 Assembly

Technologies: Java
Dates: Mar 11 – 18, 2013
Prize: $600

Lost Highways UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Mar 11 – 16, 2013
Prize: $600

Lost Highways Module Architecture

Technologies: .NET 4.0, ASP.NET, Active Directory, C#, Oracle 10g
Dates: Mar 5 – 13, 2013
Prize: $600

PXV2 Integration Service Part 3

Technologies: .NET 4.0, C#, Oracle 10g, SQL, SQL Server 2008, Windows Communication Foundation
Dates: Mar 5 – 11, 2013
Prize: $600

Module Assembly - Lycoming Warranty Claims App Frontend Assembly

Technologies: .NET 4.0, ASP.NET, C#, IIS
Dates: Mar 5 – 11, 2013
Prize: $600
1st

Code Rally Game Engine

Dates: Mar 6 – 10, 2013
Prize: $150
1st

Management Assoication Website

Dates: Mar 6 – 9, 2013
Prize: $150

Benchmarking and Reporting Tool Rewrite Release 1 Import Transaction Request Management

Technologies: EJB 3, IBM DB2, Java
Dates: Mar 2 – 9, 2013
Prize: $600

Module Assembly - MandO Conference Registration App Assembly

Technologies: .NET 4.0, ASP.NET, C#, Oracle 10g
Dates: Feb 26 – Mar 7, 2013
Prize: $600

Forecast Unit Cost Tool UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Feb 26 – Mar 5, 2013
Prize: $600

PXV2 Customer Role Test Scenarios

Technologies: .NET 4.0, ASP.NET, C#
Dates: Feb 27 – Mar 4, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Core Struts Actions and Interceptors

Technologies: EJB 3, Java, Spring, Struts
Dates: Feb 28 – Mar 4, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Import Framework

Technologies: EJB 3, IBM DB2, Java
Dates: Feb 28 – Mar 4, 2013
Prize: $600

Customer Web Portal Module Architecture

Technologies: .NET 4.0, ASP.NET, C#, HTML5, IIS, SQL Server 2008, Windows Server
Dates: Feb 13 – Mar 3, 2013
Prize: $600
1st

Talos- Javascript Popup Widget Copilot

Dates: Feb 25 – 28, 2013
Prize: $150

Module Assembly - Benchmarking and Reporting Tool Rewrite DAO Reporting Outcome Services Assembly

Technologies: IBM DB2, JDBC, Java
Dates: Feb 20 – 28, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Import Content Management

Technologies: EJB 3, Java
Dates: Feb 21 – 28, 2013
Prize: $600

Module Assembly - Benchmarking and Reporting Tool Rewrite DAO SPI and Peer Group Services Assembly

Technologies: IBM DB2, JDBC, Java
Dates: Feb 20 – 27, 2013
Prize: $600

Forecast Volume Tool UI Prorotype

Technologies: CSS, HTML, JavaScript
Dates: Feb 19 – 26, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Import Transaction Request Management

Technologies: EJB 3, IBM DB2, Java
Dates: Feb 21 – 25, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Import Data Persister

Technologies: EJB 3, IBM DB2, JDBC, Java
Dates: Feb 21 – 25, 2013
Prize: $600

Module Assembly - Lycoming Warranty Claims App Backend Assembly

Technologies: .NET 4.0, C#
Dates: Feb 19 – 25, 2013
Prize: $600

Module Assembly - Forecast Unit Cost Tool Backend Service Part 2 Assembly

Technologies: Java
Dates: Feb 19 – 25, 2013
Prize: $600

REPOST!! Benchmarking and Reporting Tool Rewrite DAO Question and Answer Services

Technologies: EJB 3, IBM DB2, JDBC, Java
Dates: Feb 15 – 23, 2013
Prize: $600

Lycoming - Warranty Claims App UI Prototype

Technologies: CSS, HTML, JavaScript
Dates: Feb 17 – 22, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Core Struts Actions and Interceptors

Technologies: EJB 3, Java, Spring, Struts
Dates: Feb 18 – 22, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Core Services

Technologies: EJB 3, IBM DB2, JDBC, Java
Dates: Feb 18 – 22, 2013
Prize: $600

PXV2 Integration Service Part 2

Technologies: .NET 4.0, C#, Oracle 10g, Windows Communication Foundation
Dates: Feb 16 – 21, 2013
Prize: $600

REPOST!! Release Assembly - TV and Movie Rating Game Assembly

Technologies: HTML5, Java, MySQL, Spring
Dates: Feb 13 – 19, 2013
Prize: $600

Lycoming - Warranty Claims App Module Architecture

Technologies: .NET 4.0, ASP.NET, C#, JavaScript, Oracle 10g
Dates: Feb 9 – 16, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Import Framework

Technologies: EJB 3, IBM DB2, Java
Dates: Feb 3 – 15, 2013
Prize: $600

Module Assembly - WebOffice SQL Enhancements Assembly 4

Technologies: SQL, SQL Server 2008
Dates: Feb 9 – 15, 2013
Prize: $600

REPOST!! Module Assembly - Code Conversion Assembly 3

Technologies: .NET 4.0, ASP.NET, C#, SQL Server 2008, Windows Server, Windows Server 2003
Dates: Feb 6 – 12, 2013
Prize: $600

Module Assembly - Impact X Launch Site Frontend Part 2 Assembly

Technologies: CSS, HTML5, Java, JavaScript, MySQL
Dates: Feb 4 – 10, 2013
Prize: $600
1st

Private Social Media Website

Dates: Feb 6 – 9, 2013
Prize: $150

Benchmarking and Reporting Tool Rewrite Release 1 Core Services

Technologies: EJB 3, IBM DB2, JDBC, Java
Dates: Feb 3 – 7, 2013
Prize: $600

REPOST! Module Assembly - Forecast Unit Cost Tool Backend Service Part 1 Assembly

Technologies: IBM DB2, IBM WebSphere Application Server, J2EE, Java
Dates: Feb 2 – 7, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Survey Import Module Architecture

Technologies: EJB 3, IBM DB2, IBM WebSphere Application Server, J2EE, Java
Dates: Jan 30 – Feb 6, 2013
Prize: $600

PXV2 Integration Service Part 1

Technologies: .NET 4.0, C#, Windows Communication Foundation
Dates: Jan 31 – Feb 5, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite DAO SPI and Peer Group Services

Technologies: Java
Dates: Jan 28 – Feb 2, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite DAO Reporting Outcome Services

Technologies: Java
Dates: Jan 28 – Feb 2, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Core DAO

Technologies: IBM DB2, JDBC, Java, Spring
Dates: Jan 29 – Feb 2, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite DAO Question and Answer Services

Technologies: EJB 3, IBM DB2, JDBC, Java
Dates: Jan 28 – Feb 1, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite DAO Base Service

Technologies: Java
Dates: Jan 28 – Feb 1, 2013
Prize: $600
1st

Resdesign of existing Dot Net Portal

Dates: Jan 28 – 31, 2013
Prize: $150

Styx - Network Analyzer Tool Bug Hunt

Technologies: .NET, C#, WPF
Dates: Jan 25 – 27, 2013
Prize: $600

Module Assembly - WebOffice SQL Enhancements Assembly 3

Technologies: SQL, SQL Server 2008
Dates: Jan 16 – 22, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Core DAO

Technologies: IBM DB2, JDBC, Java, Spring
Dates: Jan 17 – 21, 2013
Prize: $600
1st

Lycoming - .net Warranty Claims App

Dates: Jan 17 – 20, 2013
Prize: $150

Benchmarking and Reporting Tool Rewrite DAO Entities and Exceptions

Technologies: Java
Dates: Jan 16 – 20, 2013
Prize: $600

PXV2 Integration Service Part 2

Technologies: .NET 4.0, C#, Oracle 10g, Windows Communication Foundation
Dates: Jan 11 – 15, 2013
Prize: $600

Forecast Unit Cost Tool Module Architecture

Technologies: IBM DB2, IBM WebSphere Application Server, Java, Struts
Dates: Jan 9 – 14, 2013
Prize: $600

PXV2 Integration Service Part 1

Technologies: .NET 4.0, C#, Windows Communication Foundation
Dates: Jan 9 – 13, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite DAO Base Service

Technologies: Java
Dates: Jan 8 – 13, 2013
Prize: $600

PXV2 Local Services Part 3

Technologies: .NET 4.0, C#, Windows Communication Foundation, Windows Server
Dates: Jan 8 – 12, 2013
Prize: $600

Module Assembly - Forecast Volume Tool Backend Service Part 2 Assembly

Technologies: IBM DB2, IBM WebSphere Application Server, J2EE, Java
Dates: Jan 5 – 10, 2013
Prize: $600

Benchmarking and Reporting Tool Rewrite DAO Entities and Exceptions

Technologies: Java
Dates: Jan 5 – 9, 2013
Prize: $600

PXV2 Integration Service Part 3

Technologies: .NET 4.0, C#, Oracle 10g, SQL, SQL Server 2008, Windows Communication Foundation
Dates: Jan 3 – 7, 2013
Prize: $600

Module Assembly - WebOffice SQL Enhancements Assembly 2

Technologies: SQL, SQL Server 2008
Dates: Jan 2 – 7, 2013
Prize: $600

FAST! - PXV2 Integration Service Model and Exception

Technologies: .NET 4.0, C#
Dates: Jan 1 – 3, 2013
Prize: $600

Module Assembly - Impact X Launch Site Frontend Part 1 Assembly

Technologies: CSS, HTML5, J2EE, JPA, Java, JavaScript, MySQL, Spring
Dates: Dec 26, 2012 – Jan 2, 2013
Prize: $600

PXV2 Local Services Part 2

Technologies: .NET 4.0, C#, Windows Communication Foundation
Dates: Dec 23 – 27, 2012
Prize: $600

Module Assembly - PBP-BPT-Pinnacle Audit Tools Assembly 1

Technologies: .NET 3.5, C#, SQL Server, SQL Server 2008, VB.NET
Dates: Dec 20 – 25, 2012
Prize: $600

PXV2 Local Services Part 1

Technologies: .NET 4.0, C#, Windows Communication Foundation
Dates: Dec 15 – 20, 2012
Prize: $600

Module Assembly - Impact X Launch Site Backend Assembly

Technologies: J2EE, JPA, Java, MySQL, Spring
Dates: Dec 15 – 20, 2012
Prize: $600

Module Assembly - Forecast Volume Tool Backend Service Part 1 Assembly

Technologies: IBM DB2, IBM WebSphere Application Server, J2EE, Java
Dates: Dec 13 – 19, 2012
Prize: $600

Customer Web Portal Conceptualization

Dates: Dec 11 – 18, 2012
Prize: $600

Release Assembly - Journal Tool Assembly

Technologies: IBM DB2, IBM WebSphere Application Server, JSP, Java, JavaScript
Dates: Dec 11 – 16, 2012
Prize: $600

Module Assembly - WebOffice SQL Enhancements Assembly

Technologies: SQL, SQL Server 2008
Dates: Dec 7 – 12, 2012
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Import Module Architecture

Technologies: EJB 3, IBM DB2, IBM WebSphere Application Server, J2EE, Java
Dates: Dec 5 – 11, 2012
Prize: $600
1st

Praxis-MandO conference reigistration app

Dates: Dec 7 – 10, 2012
Prize: $150

PXV2 Integration Services Module Architecture

Technologies: .NET 4.0, ASP.NET, C#, IIS, Windows Server
Dates: Dec 4 – 9, 2012
Prize: $600

PXV2 Local Services Part 3

Technologies: .NET 4.0, C#, Windows Communication Foundation, Windows Server
Dates: Dec 4 – 8, 2012
Prize: $600

Module Assembly - Journal Tool Frontend Assembly

Technologies: IBM DB2, IBM WebSphere Application Server, JSP, Java, JavaScript
Dates: Dec 2 – 4, 2012
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Core Module Architecture

Technologies: EJB 3, IBM DB2, IBM WebSphere Application Server, J2EE, Java, JavaScript
Dates: Nov 29 – Dec 4, 2012
Prize: $600

PXV2 Local Services Part 2

Technologies: .NET 4.0, C#, Windows Communication Foundation
Dates: Nov 29 – Dec 3, 2012
Prize: $600

PXV2 Local Services Part 1

Technologies: .NET 4.0, C#, Windows Communication Foundation
Dates: Nov 29 – Dec 3, 2012
Prize: $600

Module Assembly - Code Conversion Assembly 2

Technologies: .NET 4.0, ASP.NET, C#, SQL Server 2008, Windows Server, Windows Server 2003
Dates: Nov 28 – Dec 3, 2012
Prize: $600

PXV2 Local Services Model and Exceptions

Technologies: .NET 4.0, C#
Dates: Nov 28 – Dec 2, 2012
Prize: $600

Module Assembly - Code Conversion Assembly 1

Technologies: .NET 4.0, ASP.NET, C#, SQL Server 2008, Windows Server, Windows Server 2003
Dates: Nov 26 – Dec 1, 2012
Prize: $600

Forecast Volume Tool Module Architecture

Technologies: IBM AIX, IBM DB2, IBM WebSphere Application Server, J2EE, JSP, Java, JavaScript
Dates: Nov 26 – Dec 1, 2012
Prize: $600

Benchmarking and Reporting Tool Rewrite DAO Module Architecture

Technologies: IBM DB2, J2EE, Java
Dates: Nov 24 – 30, 2012
Prize: $600

Release Assembly - TV and Movie Rating Game Final Assembly

Technologies: HTML5, JSP, Java, JavaScript, MySQL
Dates: Nov 24 – 29, 2012
Prize: $600

Lost Highways Conceptualization

Dates: Nov 19 – 26, 2012
Prize: $600

Benchmarking and Reporting Tool Rewrite Release 1 Test Scenarios

Technologies: IBM DB2, IBM WebSphere Application Server, J2EE, Java, JavaBean
Dates: Nov 20 – 25, 2012
Prize: $600

System Assembly - Benchmarking and Reporting Tool Rewrite Initial Assembly

Technologies: IBM DB2, IBM WebSphere Application Server, J2EE, Java
Dates: Nov 20 – 24, 2012
Prize: $600

PXV2 Front End Component Part 3

Technologies: .NET 4.0, ASP.NET, C#
Dates: Nov 19 – 23, 2012
Prize: $600

TV and Movie Rating Game Bug Hunt

Technologies: HTML, HTML5, JSP, Java, MySQL
Dates: Nov 20 – 22, 2012
Prize: $600

PXV2 Local Services Module Architecture

Technologies: .NET 4.0, ASP.NET, C#, Windows Communication Foundation
Dates: Nov 13 – 18, 2012
Prize: $600
1st

Customer Web Portal version 1 Copilot Opportunity

Dates: Nov 14 – 17, 2012
Prize: $150

PXV2 Front End Component Part 2

Technologies: .NET 4.0, ASP.NET, C#
Dates: Nov 9 – 13, 2012
Prize: $600

PXV2 Front End Component Part 1

Technologies: .NET 4.0, ASP.NET, C#
Dates: Nov 9 – 13, 2012
Prize: $600

Module Assembly - Styx - Network Analyzer Tool Assembly 2

Technologies: .NET 3.5, C#, WPF
Dates: Nov 7 – 12, 2012
Prize: $600

Module Assembly - Journal Tool Frontend Assembly

Technologies: IBM DB2, IBM WebSphere Application Server, JSP, Java, JavaScript
Dates: Nov 5 – 11, 2012
Prize: $600

Release Assembly - TV and Movie Rating Game Assembly

Technologies: HTML5, JDBC, JSP, Java, JavaScript, MySQL
Dates: Nov 7 – 11, 2012
Prize: $600

Module Assembly - HV Medicare Reports Assembly 5

Technologies: Oracle 10g, SQL Server 2008
Dates: Oct 26 – 30, 2012
Prize: $600

Journal Tool UI Protoype

Technologies: CSS, HTML, Java, JavaScript
Dates: Oct 23 – 28, 2012
Prize: $600

Module Assembly - Journal Tool Backend Assembly

Technologies: IBM DB2, Java, JavaScript
Dates: Oct 23 – 28, 2012
Prize: $600

Module Assembly - TV and Movie Rating Game Game Assembly

Technologies: Java
Dates: Oct 22 – 27, 2012
Prize: $600

PXV2 Architecture Update

Technologies: .NET 3.5, .NET 4.0, ASP.NET, C#
Dates: Oct 19 – 24, 2012
Prize: $600

Module Assembly - Business User Console Assembly

Technologies: Java
Dates: Oct 17 – 22, 2012
Prize: $600

Spec Builder Bug Hunt

Technologies: .NET 3.5, WPF
Dates: Oct 16 – 18, 2012
Prize: $600

Module Assembly - TV and Movie Rating Game Initial Assembly

Technologies: Java
Dates: Oct 6 – 11, 2012
Prize: $600

Business User Console - Front End

Technologies: J2EE, Java, MySQL
Dates: Oct 6 – 10, 2012
Prize: $600

Module Assembly - HV Medicare Reports Assembly 4

Technologies: Oracle 10g, SQL Server 2008
Dates: Oct 4 – 8, 2012
Prize: $600

Module Assembly - HV Medicare Reports Assembly 3

Technologies: Oracle 10g, SQL Server 2008
Dates: Oct 4 – 8, 2012
Prize: $600

Module Assembly - DPILS Mock RESTful Data Services Assembly

Technologies: Java, Spring, Web Services, XML
Dates: Sep 24 – 29, 2012
Prize: $600

Module Assembly - Styx - Network Analyzer Tool Assembly 1

Technologies: .NET 3.5, C#, WPF
Dates: Sep 24 – 29, 2012
Prize: $600

Module Assembly - Styx - Spec Builder Administration Assembly

Technologies: .NET 4.0, C#, WPF
Dates: Sep 20 – 28, 2012
Prize: $600

PXV2 Front End Module Architecture

Technologies: ASP.NET, C#
Dates: Sep 21 – 27, 2012
Prize: $600

Network Analyzer Tool - Network Data and Misc Services

Technologies: .NET 3.5, C#
Dates: Sep 22 – 27, 2012
Prize: $600

Module Assembly - HV Medicare Reports Assembly 2

Technologies: Oracle 10g, SQL Server 2008
Dates: Sep 19 – 24, 2012
Prize: $600

SRM Blue Load Tool

Technologies: Java, Swing
Dates: Sep 18 – 22, 2012
Prize: $600
1st

Praxis - Web Based Multiplayer Game

Dates: Sep 18 – 21, 2012
Prize: $100

Business User Console - Services

Technologies: J2EE, Java, MySQL
Dates: Sep 14 – 19, 2012
Prize: $600

Business User Console - Front End

Technologies: J2EE, Java, MySQL
Dates: Sep 12 – 16, 2012
Prize: $600

Module Assembly - Web Portal - Asset Preview Update Assembly

Technologies: EJB 3, Java
Dates: Sep 11 – 16, 2012
Prize: $600

Network Analyzer Tool - Test Report Services

Technologies: .NET 3.5, C#
Dates: Sep 10 – 15, 2012
Prize: $600
1st

Customized Dynamic Menga Menu for Web Portal

Dates: Sep 11 – 14, 2012
Prize: $150

Impact X Discovery Conceptualization

Dates: Aug 28 – Sep 11, 2012
Prize: $600

Journal Tool Module Architecture

Technologies: IBM AIX, IBM DB2, IBM WebSphere Application Server, Java
Dates: Sep 5 – 10, 2012
Prize: $600

SRM Blue Load Tool

Technologies: Java, Swing
Dates: Sep 5 – 9, 2012
Prize: $600

Module Assembly - HV Medicare Reports Assembly 1

Technologies: Oracle 10g, SQL Server 2008
Dates: Sep 4 – 9, 2012
Prize: $600

Network Analyzer Tool - Network Data and Misc Services

Technologies: .NET 3.5, C#
Dates: Sep 2 – 7, 2012
Prize: $600

Network Analyzer Tool - Network Testing Services

Technologies: .NET 3.5, C#
Dates: Sep 2 – 6, 2012
Prize: $600

Business User Console - Services

Technologies: J2EE, Java, MySQL
Dates: Sep 2 – 6, 2012
Prize: $600

Web Portal - Asset Preview Module Architecture Update 2

Technologies: EJB 3, IBM DB2, IBM WebSphere Application Server, Java, JavaScript
Dates: Aug 31 – Sep 5, 2012
Prize: $600

Module Assembly - Styx - Spec Builder Assembly

Technologies: .NET 4.0, C#, WPF
Dates: Aug 27 – Sep 4, 2012
Prize: $600

TV and Movie Rating Game Module Architecture

Technologies: Java, MySQL
Dates: Aug 29 – Sep 3, 2012
Prize: $600

Styx - Network Analyzer Tool Test Scenarios

Technologies: .NET 3.5, C#
Dates: Aug 26 – Sep 1, 2012
Prize: $600
1st

SRM Blue Load Copilot contest

Dates: Aug 27 – 30, 2012
Prize: $150

PXV2 System Architecture

Technologies: .NET 3.5, .NET 4.0, ASP.NET, C#, Windows Server
Dates: Aug 21 – 30, 2012
Prize: $600

Network Analyzer Tool - Test Agent

Technologies: .NET 3.5, C#
Dates: Aug 24 – 28, 2012
Prize: $600

Network Analyzer Tool - Network Testing Services

Technologies: .NET 3.5, C#
Dates: Aug 24 – 28, 2012
Prize: $600
1st

Exchange 2003 folder remediation tool

Dates: Aug 23 – 26, 2012
Prize: $150

Network Analyzer Tool - Test Report Services

Technologies: .NET 3.5, C#
Dates: Aug 20 – 25, 2012
Prize: $600

Business User Console Module Architecture

Technologies: HTML5, Java, MySQL
Dates: Aug 18 – 24, 2012
Prize: $600

Styx - Spec Builder and Admin Tool Test Scenarios

Technologies: .NET 3.5, C#
Dates: Aug 16 – 22, 2012
Prize: $600

Styx - Network Analyzer Tool RIA Build

Technologies: .NET 3.5, C#, WPF
Dates: Aug 14 – 19, 2012
Prize: $600

Network Analyzer Tool - Network Sniffing Services

Technologies: .NET 3.5, C#
Dates: Aug 14 – 18, 2012
Prize: $600

SpecBuilder and Tree Services

Technologies: .NET 3.5, C#, WPF, Word/Rich Text
Dates: Aug 9 – 14, 2012
Prize: $600

MS Access Forecast Unit Cost Tool Specification

Dates: Aug 7 – 13, 2012
Prize: $600

Device Loop Commissioning Tool Conceptualization

Dates: Aug 6 – 13, 2012
Prize: $600

Network Analyzer Tool - Test Agent

Technologies: .NET 3.5, C#
Dates: Aug 2 – 9, 2012
Prize: $600

DPILS Conceptualization

Dates: Aug 3 – 9, 2012
Prize: $600

Network Analyzer Tool - Network Sniffing Services

Technologies: .NET 3.5, C#
Dates: Aug 1 – 7, 2012
Prize: $600

Network Analyzer Tool - Model and Exceptions

Technologies: .NET 3.5, C#
Dates: Aug 2 – 6, 2012
Prize: $600
1st

X PRIZE - Building a prize platform

Dates: Jul 26 – 31, 2012
Prize: $250
1st

MMPPF Closed Caption Plugin Framework

Technologies: .NET 4.0, C#, Microsoft SilverLight
Dates: Jul 25 – 30, 2012
Prize: $700

SystemSet and Misc Services

Technologies: .NET 3.5, C#, WPF, Word/Rich Text
Dates: Jul 25 – 29, 2012
Prize: $600

Module Assembly - Web Portal - Asset Preview Assembly

Technologies: AJAX, Dojo, IBM DB2, IBM WebSphere Application Server, J2EE, Java, JavaScript, Spring
Dates: Jul 21 – 27, 2012
Prize: $600

Styx - Spec Builder Administration RIA Build

Technologies: .NET 3.5, C#, WPF
Dates: Jul 15 – 23, 2012
Prize: $600

MS Access Forecast Volume Tool Specification

Dates: Jul 16 – 22, 2012
Prize: $600

Market Impact Analysis Conceptualization

Dates: Jul 15 – 22, 2012
Prize: $600

Spec Builder Model and Exceptions

Technologies: .NET 3.5, C#
Dates: Jul 12 – 16, 2012
Prize: $600

SystemSet and Misc Services

Technologies: .NET 3.5, C#, WPF, Word/Rich Text
Dates: Jul 10 – 16, 2012
Prize: $600

SpecBuilder and Tree Services

Technologies: .NET 3.5, C#, WPF, Word/Rich Text
Dates: Jul 10 – 16, 2012
Prize: $600

Styx - Spec Builder Administration Module Architecture

Technologies: .NET 3.5, C#, WPF, Word/Rich Text
Dates: Jul 10 – 15, 2012
Prize: $600

Web Portal - Document Preview Generator

Technologies: Java
Dates: Jul 4 – 8, 2012
Prize: $600

Styx - Network Analyzer Tool Module Architecture

Technologies: .NET 3.5, C#
Dates: Jun 30 – Jul 7, 2012
Prize: $600

TV and Movie Rating Game Conceptualization

Dates: Jun 27 – Jul 6, 2012
Prize: $600

PXV2 Conceptualization

Dates: Jun 28 – Jul 6, 2012
Prize: $600

Styx - Spec Builder Module Architecture

Technologies: .NET 3.5, .NET 4.0, C#, WPF, Word/Rich Text
Dates: Jun 26 – Jul 1, 2012
Prize: $600

MS Access Journal Tool Specification

Dates: Jun 25 – Jul 1, 2012
Prize: $600

Web Portal - Asset Preview Module Architecture Update

Technologies: AJAX, HTML, Java, JavaScript
Dates: Jun 19 – 24, 2012
Prize: $600
1st

Create a best in class E-Commerce B2B portal

Dates: Jun 19 – 22, 2012
Prize: $300

Styx - Spec Builder Specification

Dates: Jun 14 – 19, 2012
Prize: $600

Benchmarking and Reporting Tool Rewrite Wireframes

Dates: Jun 7 – 17, 2012
Prize: $600
1st

Market Impact Analysis

Dates: Jun 13 – 16, 2012
Prize: $150

Styx - Spec Builder RIA Build

Technologies: .NET, WPF
Dates: Jun 8 – 13, 2012
Prize: $600

Styx - Network Analyzer Tool Wireframes

Dates: Jun 2 – 12, 2012
Prize: $600

PoC Assembly - PPT Generation PoC Assembly

Technologies: Java
Dates: Jun 4 – 9, 2012
Prize: $600
1st

TV And Movie Ratings App

Dates: Jun 4 – 8, 2012
Prize: $150

Styx - Spec Builder Administration Wireframes

Dates: May 28 – Jun 8, 2012
Prize: $600

Web Portal - Controller and Pages

Technologies: JSP, Java, JavaScript
Dates: May 31 – Jun 5, 2012
Prize: $600

Web Portal - Controller and Pages

Technologies: JSP, Java, JavaScript
Dates: May 22 – 27, 2012
Prize: $600

PPT Generation POC Architecture

Technologies: Java
Dates: May 18 – 24, 2012
Prize: $600

Styx - Spec Builder Storyboard

Dates: May 12 – 20, 2012
Prize: $600

Web Portal - Document Preview Generator

Technologies: Java
Dates: May 16 – 20, 2012
Prize: $600

Web Portal - Document Preview Service

Technologies: Java
Dates: May 16 – 20, 2012
Prize: $600

Benchmarking and Reporting Tool Rewrite System Architecture

Technologies: IBM DB2, IBM WebSphere Application Server, Java
Dates: May 13 – 20, 2012
Prize: $600

Styx - Network Analyzer Tool Conceptualization

Dates: May 14 – 20, 2012
Prize: $600

Module Assembly - Payment Processor Assembly

Technologies: .NET 3.5, C#, HTTP, XML
Dates: May 10 – 16, 2012
Prize: $600

Module Assembly - 5500 Genetic System Web Application Assembly

Technologies: AJAX, CSS, Dojo, HTML, JSON, JSP, Java, JavaScript
Dates: May 2 – 8, 2012
Prize: $600
1st

Styx - Windows Service

Dates: Apr 29 – May 2, 2012
Prize: $150

Payment Processor Module Architecture

Technologies: .NET, HTTP, XML
Dates: Apr 25 – May 1, 2012
Prize: $600
1st

Morpheus - 408 database development

Dates: Apr 27 – 30, 2012
Prize: $150

Styx - Configuration Utility Wireframes 1

Dates: Apr 17 – 30, 2012
Prize: $600
1st

Styx - Network Analyzer Tool Copilot

Dates: Apr 25 – 28, 2012
Prize: $150
1st

Benchmarking and Reporting Tool Rewrite

Dates: Apr 18 – 21, 2012
Prize: $250
1st

Sales Asset Manager Monthly Exec Report creation

Dates: Apr 17 – 20, 2012
Prize: $150

Web Portal - Document Preview Generator

Technologies: Java
Dates: Apr 11 – 16, 2012
Prize: $600

Web Portal - Document Preview Service

Technologies: Java
Dates: Apr 11 – 16, 2012
Prize: $600

5500 Genetic System Web Application UI Prototype

Technologies: AJAX, CSS, Dojo, HTML, Java, JavaScript
Dates: Apr 11 – 16, 2012
Prize: $600

Web Portal - Asset Preview Module Architecture

Technologies: AJAX, JSP, Java, JavaScript, Servlet
Dates: Mar 30 – Apr 5, 2012
Prize: $600

Web Portal - Asset Preview UI Prototype

Technologies: HTML, JavaScript
Dates: Mar 30 – Apr 4, 2012
Prize: $600

Styx - Spec Builder Conceptualization

Dates: Mar 26 – Apr 2, 2012
Prize: $600

5500 Genetic System Web Application Storyboard

Dates: Mar 21 – 28, 2012
Prize: $600

Web Portal - Asset Preview Storyboard

Dates: Mar 21 – 27, 2012
Prize: $600

5500 Genetic System Web Application Module Architecture

Technologies: AJAX, HTML, JavaScript, PostgreSQL
Dates: Mar 20 – 26, 2012
Prize: $600
1st

Styx - Spec Builder Copilot

Dates: Mar 15 – 18, 2012
Prize: $150
1st

Web Portal asset preview functionality

Dates: Mar 14 – 17, 2012
Prize: $150

Module Assembly - Aegle - Actuarial Equivalent Plans Assembly

Technologies: .NET 3.5, ASP.NET, C#, IBM DB2, SQL Server 2008, SSIS
Dates: Mar 2 – 10, 2012
Prize: $600

Query and Report Generation Module Architecture

Technologies: Java
Dates: Feb 28 – Mar 6, 2012
Prize: $600

Vulcan - Configuration Utility Conceptualization

Dates: Feb 20 – 27, 2012
Prize: $600
1st

5500 Genetic System Web Application Copilot

Dates: Feb 22 – 25, 2012
Prize: $150

Aegle - Actuarial Equivalent Plans Module Architecture

Technologies: .NET 3.5, ASP.NET, C#
Dates: Feb 17 – 23, 2012
Prize: $600

Query and Report Generation Conceptualization

Dates: Feb 10 – 16, 2012
Prize: $600
1st

Vulcan - Configuration Utility Co-pilot Posting

Dates: Feb 8 – 11, 2012
Prize: $150
1st

Query and Report Generation

Dates: Feb 2 – 5, 2012
Prize: $150

Module Assembly - Styx Communication Server UI Update Assembly

Technologies: .NET 4.0, C#, WPF, XAML, XML
Dates: Dec 9 – 15, 2011
Prize: $600
2nd

Mobile App Copilot

Dates: Dec 7 – 10, 2011
Prize: $100
1st

Business Continuity Mobility System Data Import Architecture

Technologies: C#, SQL Server 2008, Windows Server, XML
Dates: Dec 1 – 6, 2011
Prize: $1,400

Styx - Communication Server UI Update Module Architecture

Technologies: .NET 4.0, C#, WPF, XML
Dates: Nov 21 – 26, 2011
Prize: $600
1st

Praxis - Purchase Agreement Creation Application

Dates: Nov 15 – 18, 2011
Prize: $150
1st

Javascript Custom Opportunity Audit Trail Dojo Widget

Technologies: Dojo, JavaScript
Dates: Nov 2 – 6, 2011
Prize: $700
1st

Styx - Communication Server UI Update

Dates: Nov 2 – 5, 2011
Prize: $200
1st

BluePages Search Dojo Widget

Technologies: Dojo, JavaScript
Dates: Oct 28 – Nov 1, 2011
Prize: $1,000
1st

MPRTC Mobile Application

Dates: Oct 27 – 30, 2011
Prize: $100

IPFS - Tiling Prototype Shared Library Module Architecture

Technologies: .NET 3.0, C#, XML
Dates: Oct 11 – 17, 2011
Prize: $600

Proof of Concept Assembly - IPFS Web Tile Interface

Technologies: .NET 3.0, ASP.NET, C#, JavaScript
Dates: Oct 11 – 16, 2011
Prize: $600
1st

Business Continuity Mobility System REST Services Architecture

Technologies: .NET, SQL Server 2008, Windows Server
Dates: Oct 4 – 9, 2011
Prize: $1,600
1st

Javascript Custom Review Comment Dojo Widget

Technologies: JavaScript
Dates: Sep 29 – Oct 3, 2011
Prize: $800

Proof of Concept Assembly - IPFS Windows Forms Tile Interface

Technologies: .NET 3.0, C#, WinForms Controls
Dates: Sep 26 – Oct 2, 2011
Prize: $600
1st

Praxis B2B Web Application Co-Pilot

Dates: Sep 28 – Oct 1, 2011
Prize: $150

IPFS - Tiling Prototype Spefication

Dates: Sep 19 – 25, 2011
Prize: $600
2nd

Contracts Front End - Front End Module Architecture

Technologies: Java
Dates: Sep 18 – 23, 2011
Prize: $700

Popular Members


✱) Disclaimer

This service is non-official, and it is not related with Topcoder company. Workload and earning estimates are based on public data available from public Topcoder APIs, and they might be incomplete and erroneous. In particular:

  • Member records include only challenges (i) in which selected member won a prize superior to $100; or (ii) which were copiloted by the member. All first=to-finish challenges are deliberately excluded from the records. Most of data science challenges (Marathon and Single Round Matches) are missing in the records, because they are not reported by the public Topcoder API used by this service (with exception of very recent Marathon Matches).
  • Some records are manually added / corrected for selected members, e.g. to include Topcoder Open victories into results.
  • The time spent by member on competing (copiloting) is estimated as the overall runtime of corresponding challenges included into this member's records. The runtime of a challenge is calculated from the challenge registration start to its submission deadline. If several challenges from member records were running on the same day, that day is counted only once. Overall, this is a very rough estimation of member worktime, which may be very different from the actual time/efforts spent by a member on its challenges.
  • Total earnings from competing are estimated as a sum of prizes won by selected member in the challenges included into his records. The public Topcoder API does not disclose the actual copiltoing payments received by copilots for each challenge, thus to estimate copiloting earning we assume the standard $600 copilot payment for regular-size challenges, and $5000 payment for Marathon Matches.
  • The effective hourly rate is estimated as the total competing (copiloting) earnings divided by 1/3 of estimated time spent by member on copiloting/competing (because the competing/copiloting time estimates are done as the total runtime of a challenge, and do not factor in ~8h out of 24h workday).

Overall, the absolute estimations of workload, earnings, and effective hourly rate should be taken with a grain of salt; however, these estimations should be adequate to compare relative earnings and workload of different members.

© Dr. Pogodin Studio, 2018–2025 — ‌doc@pogodin.studio‌ — ‌Terms of Service